20
IT 1002 Order No. BA 93-66-1202 Issue 01.06.08
3.5
Shielding Gas Connection
Observe the standards (see appendix) when handling the
shielding gas bottles.
Connect the gas hose of the shielding gas bottle to the gas inlet of the power
unit.
Connect the gas hose of the welding gun to the gas outlet.
Set the flow meter of the shielding gas bottle to 8 - 16 liters/min.
Minimum flow rate for stud welding with shielded gas is 8 l/min.
A gas mixture of 82% Argon (Ar) and 18% carbon dioxide (CO
2
) is mainly used for stud
welding.
3.6
Change Working Place
Switch off the power unit. In this way, you avoid any risk of
electrical shock.
When you move your workplace, disconnect the welding gun and the ground
cables from the power unit. Proceed in reversed sequence as described in
sections 3.2, 3.3, 3.4 and 3.5.
After changing the workplace, check the welding gun and the ground cables for
possible damage or missing components.
Summary of Contents for 93-66-1202
Page 1: ...IT 1002 Power Unit Ceramic Gas Version 93 66 1202 Operating Manual...
Page 8: ...viii IT 1002 Order No BA 93 66 1202 Issue 01 06 08...
Page 51: ...IT 1002 Order No BA 93 66 1202 Issue 01 06 08 51 Power unit IT 1002 93 66 1202...
Page 55: ...IT 1002 Order No BA 93 66 1202 Issue 01 06 08 55 Supply module complete IT 1002 88 17 997...
Page 59: ...IT 1002 Order No BA 93 66 1202 Issue 01 06 08 59 Terminal plate complete IT 1002 88 18 013...
Page 61: ...IT 1002 Order No BA 93 66 1202 Issue 01 06 08 61 Power unit complete IT 1002 88 17 929...
Page 62: ...62 IT 1002 Order No BA 93 66 1202 Issue 01 06 08 8 3 Electrical Circuit Diagram...
Page 71: ...IT 1002 Order No BA 93 66 1202 Issue 01 06 08 71 Service Support...
Page 75: ......