21
During operation do not reach into extractor device!
Lubricate the threaded spindle 4930-1 before each use!
3
Design and Function
Assembling the wheel hub bearing
• Put the 5 thrust pins
F
into the receiving holes of the thrust plate
E
.
• Insert the thrust ring halves
A
laterally between the rear side of the wheel hub flange and the
circlip and tighten firmly with the 2 cylinder head screws M8 x 35.
• Put the threaded spindle 4930-1 with the thrust plate
E
and the 5 inserted thrust pins
F
from out-
side onto the wheel hub bearing that the thrust pins
F
protrude the threaded holes of the wheel
hub and are supported at the front side of the thrust ring
A
.
• Put the thrust plate
c
onto the spindle nut 4930-2.
• Put the wheel hub bearing with the attached thrust plate
E
and the spindle 4930-1 from outside
into the bearing housing. At the same time insert the thrust washer
c
with the spindle nut 4930-
2 into the interior of the bearing housing (axle body) and then screw in the spindle nut 4930-2.
• Before the new wheel hub bearing is assembled, it has to be ensured that it is axially parallel
and centric to the receiving hole of the bearing housing (axle body).
3
4
Cylinder head
screw
M8 x 35
4930-2
c
A
F
E
4930-1
Bearing housing / Axle body
Summary of Contents for HAZET 4934-2562/6
Page 27: ... 27 Notizen Notes ...