i
H - 1 0 6 R O C K - E Z E O P E R A T I N G I N S T R U C T I O N S
F O R W A R D
Foreword
All personnel must read and understand before operating unit
•
Section 2, ”Dealer Preparation,” to verify that the machine has been prepared
for use.
•
Section 3, “Introduction,” which explain normal operation of the machine.
•
Foreword and Section 4, important safety information.
•
Section 5.1, “Pre-Operation Inspection”.
Appropriate use of the unit
This H-106 ROCK-EZE combination windrower and rock picker is designed to
windrow fields while picking rocks with diameters from 2 to 15 inches.
Operator protection
As with all machinery, care needs to be taken by the operator in order to insure the
safety of the operator and those in the surrounding area.
Operators and those observing the operation of the H-106 ROCK-EZE
are required to wear head, eye, and ear protection. No loose clothing is
allowed.
Summary of Contents for ROCK-EZE H-106
Page 2: ...The Innovation Continues ...
Page 4: ...The Innovation Continues ...
Page 8: ...iv H 1 0 6 R O C K E Z E O P E R A T I N G I N S T R U C T I O N S The Innovation Continues ...
Page 66: ...58 58 58 58 58 H 1 0 6 R O C K E Z E P A R T S R E F E R E N C E D E C A L S ...
Page 68: ...60 60 60 60 60 H 1 0 6 R O C K E Z E P A R T S R E F E R E N C E The Innovation Continues ...
Page 70: ...The Innovation Continues ...