![Haybuster ROCK-EZE H-106 Operating Instructions And Parts Reference Download Page 32](http://html.mh-extra.com/html/haybuster/rock-eze-h-106/rock-eze-h-106_operating-instructions-and-parts-reference_2110347032.webp)
24
H - 1 0 6 R O C K - E Z E
O P E R A T I N G I N S T R U C T I O N S
Section 6: General maintenance
NOTE:
Before performing any service or maintenance on your ROCK-EZE,
review the safety guidelines for performing service and maintenance in section
4.4 “Safety review” under the heading “
WHEN PERFORMING SERVICE
AND MAINTENANCE
”.
6.1 Lubrication
LUBRICATION INSTRUCTIONS
: The operator should make a check of all
grease fittings in the unit before beginning to operate it so as to become familiar
with their location and the correct service schedule.
Most moving parts should be greased daily with the exception of the two
Windrower rotor bearings which run in dirt constantly. These should be greased
several times per day to prolong bearing life. Outer bearing has zerk on top of
housing, Inner bearing is greased through tube extending to zerk on front of
mainframe. Chain drive case should be checked periodically
WARNING:
Use normal shutdown procedure (Page 18) before lubricating
machine.
Use only a high quality, multi-purpose grease when lubricating the unit. Make
sure all fittings and the nozzle of the grease applicator are clean before applying
the grease. If any grease fittings are missing, replace them immediately.
.
Summary of Contents for ROCK-EZE H-106
Page 2: ...The Innovation Continues ...
Page 4: ...The Innovation Continues ...
Page 8: ...iv H 1 0 6 R O C K E Z E O P E R A T I N G I N S T R U C T I O N S The Innovation Continues ...
Page 66: ...58 58 58 58 58 H 1 0 6 R O C K E Z E P A R T S R E F E R E N C E D E C A L S ...
Page 68: ...60 60 60 60 60 H 1 0 6 R O C K E Z E P A R T S R E F E R E N C E The Innovation Continues ...
Page 70: ...The Innovation Continues ...