
09/16
7501BL/7501BL240
Page 3 of 5
INSTALLATION PROCEDURE
STEP 1:
Install power cord per local electrical code (7501BL240 only). Requires drilling hole
in junction box and installing appropriate cord seal.
Heat trace routing
configuration may vary.
STEP 2:
Unpack 7501BL/7501BL240 blanket. Lay flat with inner surface (silver) up.
STEP 3:
Set 7501 tank bottom down on the blanket in the orientation shown.
STEP 4:
Wrap the 7501BL/7501BL240 up and over the 7501 tank and attach bottom Velcro
closures.