ASSEMBLING THE SIDE PONTOONS
1.
Using the crane, lift the side pontoon and make sure that the center of the side pontoon
box beam is aligned with the S-chamber of the pontoon.
2.
Insert the side pontoon box beam into the S-chamber of the pontoon.
3.
Lock the side pontoon by inserting the locking pin as shown in Figure 6.10.
4.
Connect the hydraulic system from the slewing frame two-way ball valves to the pontoon
body, and the two-way ball valves on the top of the side pontoon to the pontoon body,
as shown in Figure 6.11 and Figure 6.12.
Figure 6.10
Side pontoon
S-chamber
Lock
pin
Hydraulic hose
connection
1
/2
“
1
/4 “
1
/2
“