106
2420333140
E06.13 EN
Lubrication-Tightening-Clearance check
Slew ring
E005
15 mn
After having carried out the measurement :
• Lower the boom at horizontal position.
• Lift the arm (if exists) as its maximum position. Don’t extend the telescopic boom.
• The telescopic boom should be fully extended and in the horizontal position..
• Jib in horizontal position(if fitted).
In its new configuration, note the clearance ( J1) between chassis (or turret) and the slew ring as
previously.
• If the difference between two measurements does not exceed 2 mm : the test validates correct operation.
• Otherwise, contact HAULOTTE Services® to repair the system.
6 - Clearance check
7 - Additional operation
1.
Place the machine in its operating configuration.
3.3.2-Placing in operating configuration
2.
Rotate the slew ring by one complete turn.
Consult the After-Sales Service HAULOTTE Services®.
A tight spot or grinding sound during rotation or the presence of metal particles escaping from the lip seal
are signs of abnormal wear in the raceway (Contact HAULOTTE Services®).
Summary of Contents for H28TJ+
Page 2: ...2 2420333140 E06 13 EN Telescopic machines 28 43 m...
Page 6: ...6 Maintenance book...
Page 16: ...16 2420333140 E06 13 EN Telescopic machines 28 43 m A Safety precautions...
Page 34: ...34 2420333140 E06 13 EN Telescopic machines 28 43 m B Recommendations...
Page 98: ...98 2420333140 E06 13 EN Control Oil change Wheel reducer E002 15 mn...
Page 100: ...100 2420333140 E06 13 EN Replacement Hydraulic filter cartridge E003 15 min...
Page 102: ...102 2420333140 E06 13 EN Filling up Oil change Fuel tank E004 15 mn...
Page 110: ...110 2420333140 E06 13 EN Replacement Tightening Wheel E006 15 min...
Page 112: ...112 2420333140 E06 13 EN Tightening Screws bolts and nuts E007 15 min...
Page 114: ...114 2420333140 E06 13 EN Control Oil change Turntable rotation gearbox E008 15 mn...
Page 116: ...116 2420333140 E06 13 EN Control Lubrication Replacement Pulleys and wear pads E013 15 mn...
Page 120: ...120 2420333140 E06 13 EN Control Lubrication Chains E016...
Page 132: ...132 2420333140 E06 13 EN Cables and chains Specific adjustment procedure H43TPX HB135JRT E053...
Page 136: ...136 2420333140 E06 13 EN Control Filling up Battery charge Battery E018 10 min...
Page 138: ...138 2420333140 E06 13 EN Lubrication Telescope E022 15 mn...
Page 142: ...142 2420333140 E06 13 EN Control Cable carrier cat track E048 30 min...
Page 146: ...146 2420333140 E06 13 EN Telescopic machines 28 43 m D Diagnosis assistance...
Page 192: ...16 Electrical diagram Telescopics 28 to 43 m...