55
4001015340
E 12.18
USA / GB
General data
Pins and bearing inspection
MS0002
General data
Pins and bearing inspection
1 - You will need
2 - Preliminary operation
The operations of disassembling if they exist should be carried out only on the installations completely disconnected
and must be entrusted only to people having the necessary technical training.
Respect, in addition to the instructions appearing in the present instructions, the legal tendencies generally applicable
for safety accident prevention.
All the precautions must be done in work before intervening on and near the machine.
After completion of work, all the covers and safety devices must be positioned back completely and operational.
• Standard tool kit
• Protective goggles
• Gloves
• Place barriers around the perimeter of the work area
Exclusively use tools and auxiliary average adapted. Always wear necessary safety clothing.
Summary of Contents for H12SX
Page 54: ...54 4001015340 E 12 18 USA GB Control Filling up Oil tank M001 Notes...
Page 64: ...64 4001015340 E 12 18 USA GB Replacement Hydraulic filter cartridge M003 Notes...
Page 66: ...66 4001015340 E 12 18 USA GB General data Braking test procedure MS0004 Notes...
Page 74: ...74 4001015340 E 12 18 USA GB Lubrication Steering wheel pivots M010 Notes...
Page 76: ...76 4001015340 E 12 18 USA GB Lubrication Guide rail M011 Notes...
Page 78: ...78 4001015340 E 12 18 USA GB Lubrication Cylinder hinge M012 Notes...
Page 82: ...82 4001015340 E 12 18 USA GB Electric Electrical wiring MS0025 Notes...
Page 86: ...86 4001015340 E 12 18 USA GB Turntable Universal plug MS0133 Notes...