21
Art. Nr.: 5090032102
Rev.: 00/2017-11-30
Fig: 2
Fig.: 1
KES-M ZVR-FUBO-FIX
EN
12 Assembly of KES-M ZVR-FUBO-FIX
1
Insert the four adjustable ground spikes into the outter
threaded pins of the moulding strip and screw fi rmly with
(see fi g.: 2 and 3), then align approximately using the
profi le board.
Legend for Fig.: 3
1
Moulding strip
2
Threaded pin/sliding nut
3
Washer
4
Nut
5
Adjustable ground spikes
Insert sliding nuts with threaded pins of the ground inlet
provided into the moulding strip (see fi g.: 1).
2
suitable for:
KES-M90-ZVR100/500,
KES-M110-ZVR 100/500 and
KES-M150-ZVR150/500
Install all sliding nuts with threaded pins of the pipe
clips or attachment plates to be mounted prior to
installing the ground spikes.
The position of the ground spikes can be adapted
variably or optionally* to the planned installation
combination and the moulding strip can be shortened
by sawing if necessary.
*e.g. if the size of the installation pit is insuffi cient.
Fig.: 3
1
2
5
3
4
1
13 Assembly of the KES-System 150 ( KES-System 110/90)
NOTE!
Incorrect assembly!
Improper installation can result in damage.
• The rubber sleeve and spiral hose must not be
lubricated.