Form No. GRM_CN-0818
11
English
Models
(A)
(B)
(C)
GRA and
GRAL
254 mm
(10″)
76 mm
(3″)
25 mm
(1″)
GRAH and
GRAHL
343 mm
(13-1/2″)
76 mm
(3″)
25 mm
(1″)
A
B
C
Shelf
Back W
all
Counter
Combustible Clearance Requirements
NOTE: The size of heat patterns vary depending on the height
of the unit.
Minimum Clearance Requirements for
Combustible Surroundings
NOTE: Dual strip heaters cannot be installed in
combustible surroundings.
Recommended Mounting Heights
102–152 mm
(4″–6″)
305 mm (12″)
203–279 mm
(8″–11″)
Standard Wattage
Height
High Wattage
Height
279–356 mm
(11″–14″)
Add 76 mm (3″) for
units with lights.
Recommended Element Height for the
GR, GRA, GRL, GRH, GRHL, GRN, GRAH, GRAL, GRNH, and
GRAHL models in all lengths (excluding dual models).
381 mm (15″)
533 mm (21″)
356–457 mm
(14″–18″)
254–356 mm
(10″–14″)
Standard Wattage
Height
High Wattage
Height
Recommended Element Height for dual models
with a 76 mm (3″) spacer in all lengths.
254–356 mm
(10″–14″)
Standard Wattage
Height
356–457 mm
(14″–18″)
457 mm (18″)
610 mm (24″)
High Wattage
Height
Recommended Element Height for dual models
with a 152 mm (6″) spacer in all lengths.
INSTALLATION
Summary of Contents for GLO-RAY GR-18
Page 36: ...GRM_CN 0818 36 90 C 194 F 15 No 14 AWG 20 No 12 AWG 20 25 No 10 AWG 25 30 No 8 AWG 20 20...
Page 37: ...GRM_CN 0818 37 Hatco RMB CE...
Page 38: ...GRM_CN 0818 38 Glo Ray 30 I O 15 12 2 1 I O I 15 20 2 I O I I O 0 I O 1 I O O O 2 I O O...
Page 39: ...GRM_CN 0818 39 1 2 3 4 NSF 1 2 Hatco NSF 220 230 Hatco P N 02 30 058 00 Glo Ray 0512 6732 5091...