
12
3. Assembly of the net:
The net is not part of the delivery. The following pictures only describe further assembly
steps. Different net executions are available.
a) Fixing of rope at the mechanical upright
Pull loop of the rope over the guide roller at the sliding
device of the mechanical upright and fix it in the hook.
In order to have enough space for the tensioning
process the hook has to be placed at the top of the
mechanical device. If not please change the position
accordingly by sticking on the universal joint and
turning the hook.
b) Fixing of rope at the counter upright:
Fix tensioning rope directly in the expanded eye of the
sliding device.
guide
roller
tensioning rope
tensioning rope
eye
hook