![Harvest TEC 445Z Installation Manual Download Page 7](http://html1.mh-extra.com/html/harvest-tec/445z/445z_installation-manual_2103712007.webp)
7
Installation of Gauge and Hose Manifold
A.
Drill two 3/8” holes and mount pressure gauge to sheet metal. Bend the gauge bracket to adjust the
angle.
B.
Secure with two 5/16” x 1” flange bolts and flange nuts.
Placement of Spray Nozzle Assembly
The cross bar on the wind guard above the pick-up head provides a mounting point for the nozzle holders
(001-4714J). Mount the nozzle holders on the wind guard, using the supplied U bolts (001-4714UBS).
Measuring from the center of the baler, the nozzle holders will need to be 6” (15cm) apart on a 4’ (1.2M) and
9” (23cm) apart on a 5’ (1.5M) Do not fully tighten.
Position the nozzle holders so that the tips spray in a
horizontal direction over the top of the baler’s pickup.
The tips should be located so that they will be
between 14” and 18” (35 - 45 cm) from the normal path of hay.
Make sure the nozzle holders do not interfere with the tying system. *It is recommended to test the system
with water prior to field operation. This will ensure the fan pattern from the tips reaches the outside edges of
the pickup while having a slight overlap in the center.