Page 3
Socket Installation
1.08m
IMPORTANT:
must
away
Sockets
be leant back 3° diagonally
from the
goal, as indicated by the arrows above
i
3°
600mm
600mm
Ground Level
40-100mm
Code
Product
FBL-849
Stadium Pro Freehanging Net Supports - 2 Post
1
Dig holes at a
600mm and concrete in Sockets (14), leaving 40-100mm from top of
concrete to ground level
minimum
3
14
PLAN VIEW
1m
IMPORTANT:
Consult a construction engineer for advice where
required. Ensure concrete has fully hardened before proceeding with
your assembly
i
17
9.422m
Drainage Hole