background image

350 Cheek Block

Using block as template, mark holes using a centerpunch. Remove block and 

drill holes using a 

11

/

64

" (4.2 mm) drill. Bevel top of deck holes using a small 

knife to allow sealant to mass. Through-bolt block using recommended  

stainless steel fasteners, washers and locknuts.

Reeving Multi-Purchase Systems

For larger, printable diagrams, please see: 

www.harken.com

.

Integral Becket—348 / 352

Deadend line at mouth to construct a 2:1 or 3:1 system.

Part

No.

Fasteners

A

B

C

in

mm

in

mm

in

mm

350

M4 or #8 PH/RH*

1

3

/

16

30

*Fastener length: Add deck thickness and overhang for nut and washer.

350

B

349 Stand-Up

Part

No.

Fasteners

A

B

C

in

mm

in

mm

in

mm

349

M5 or #10 PH/RH

7

/

16

11

1

1

/

4

32

1

11

/

16

43

*Fastener length: Add deck thickness and overhang for nut and washer.

A

C

B

Using eyestrap as template, mark holes using a centerpunch. Remove block 

and drill holes using a 

11

/

64

" (4.2 mm) drill. Bevel top of holes using a small 

knife to allow sealant to mass. Through-bolt using recommended stainless  

steel fasteners, washers and locknuts.

5:1 Right-Angle Reeving 

Dead-end on Becket

1

2

3

4

5

5

Right-angle reeving  

dead-end on becket

5:1

4:1 Right-Angle Reeving 

Dead-end on Becket

1

2

3

4

4

4:1

Right-angle reeving  

dead-end on becket

1

2

3

4

5

6

6:1 Right-Angle Reeving  

Dead-end on cam

6:1 Right-Angle Reeving 

Dead-end on becket

6

2

3

4

5

6

6

1

Right-angle reeving  

dead-end on becket

6:1

3-Way U-Lock—342 / 343 / 344 / 345 / 346 / 347 / 381

The 3-Way U-Lock allows a change of headpost direction from 

front to side or allows the block to swivel. To change headpost 

direction, remove shackle, turn post, install shackle. Remove 

U-Lock to allow block to swivel.

Reviews: