11
STEP 13
STEP 14
STEP 15
M6*12 4PCS
M6 Nut 4PCS
fig. 13
fig. 14
M5*12 2PCS
M5*Nut 2PCS
— Insert grease bucket holder through
the hole inside the smoking chamber
on the left side to hang under the
smoking chamber.
— Attach bottle opener to smoking
chamber with M5 x 12 bolts (BB)
and M5 nuts (FF).
— Attach smoke stack and smoke
stack gasket to the smoking
chamber with M6 x 12 bolts (AA) and
M6 nuts (DD).
— Insure that the gasket is in between
the smoke stack and smoking
chamber.
— Remove cap nut and spring from
smoke stack.
— Place smoke stack damper over the
bolt at the top of the smoke stack.
Then place the smoke stack damper
spring over the bolt and tighten with
cap nut.
Smoke stack damper
Cap nut
Spring
Smoke stack
DD
AA
FF
BB
fig. 15
Summary of Contents for HK0537
Page 2: ......