
HARDY MANUFACTURING CO., INC (MODEL KB125) PAGE 20
6-2
Loading the KB125
The following steps should be completed to load the KB125 Hardy Heater:
1. Open the bypass damper (located on the left side of the firebox door).
2. Open the firebox door.
3. Flip the blower switch off (located on the left side of the heater), light will turn on. This
will begin the off delay timer that is set for 5 minutes.
4. Open the ash door.
5. Remove the ashes with the provided shovel.
6. Close the ash door.
7. Rake the coals around in the firebox.
8. Confirm that the two holes in the fire grates are open.
9. Load the heater firebox with the amount of wood needed for your application.
10. Close the firebox door.
11. Close the bypass damper.
12. Flip the blower switch on, light will turn off. Keep in mind that the off delay timer could
still be timing.