![Hardy Process Solutions HIFS-3030-01-PS-S Operation And Installation Manual Download Page 51](http://html.mh-extra.com/html/hardy-process-solutions/hifs-3030-01-ps-s/hifs-3030-01-ps-s_operation-and-installation-manual_597413051.webp)
Index
load forces 1-1
load sensor bolts 1-24
Load Sensors 1-6
loops 1-29
M
Material Substitution 1-13
Maximum Overload 1-2
Mild Steel Deck, Painted 1-14
mild steel ramp 1-30
MODEL CODE BREAKDOWN 1-14
N
Natural Rubber 1-3
NEMA 4X 1-3
NEMA Rating 1-3
Non-Hostile applications 1-29
non-level floor 1-1
non-scale traffic 1-34
nylon strap 1-4
nylon strapping 1-23
O
Optional Bolt Down Plates 1-11
OPTIONAL BOLT-DOWN PLATES 1-33
OPTIONAL BUMPER GUARDS 1-34
OPTIONAL PIT FRAMES 1-25
P
Paint 1-3
phillips screwdriver 1-17
pit coping 1-28
pit drainage 1-28
pit floor 1-28
pit mounting surface 1-1
Platform Height 1-1
Platform Material 1-1
Summary of Contents for HIFS-3030-01-PS-S
Page 4: ......
Page 8: ...Hardy Floor Scales iv ...
Page 10: ...Hardy Floor Scales II ...
Page 53: ...Index Total Error 1 2 TROUBLESHOOTING 1 36 U UNPACKING 1 4 W welding 1 7 ...
Page 54: ...Hardy Floor Scales ...