DANGER!
The previously named colour codes are NOT obligatory on an
international level: If the cores are colour-coded differently please
contact a qualified electrical company and have them examine the lead
and if required, replace it.
5
If there is no built-in eCB1 module and communication through the external
eCB1 module is preferred instead, the RS-485 Bus cable of the external
eCB1 module has to be inserted from below. The RS-485 Bus cable will be
clipped in the middle of the cPH1 like so:
Blue is
M
Brown is
B
Black is
A
6
Turn the circuit breakers and fault-current circuit breakers back on. (Switch
Position I ON) The LED lights will glow green.
7
To re-attach the front cover,
7.1
first plug the LED-Display back in and put it on top of the charging
station.
7.2
Then close the charging station by re-attaching the front cover.
7.3
Secure it with the two screws on the bottom of the front cover.
The electrical installation is now complete.
PLEASE NOTE!
The first time operating the charging station should be executed by a
qualified electrician in any case. They can determine correct
operation as well as repair malfunctions or mistakes that had been
made during the installation.
Instruction Manual
cPH1
charging station
Version: 1.2.4
18