10
Operation order for update and Initialize machine systems
2-2
* Work sequence of Updating Program are described below.
If you need more detail information fro each sequence, please reference each manual
1. Insert CF card saved update program to slot of control panel.
Press and keep [MENU] button and turn on the machine
2. Go to maintenance mode and practice install.
3. Update [CPU board program] from EP-ROM tip.
(In case, Machine program brake completely, you can re-install CPU board program
only from EP-ROM tip)
Turn off machine and connect EP-ROM saved machine program tip to socket on CPU board.
Flip dipswitch [DSW2 to OFF] and [DSW4 to ON], then turn on machine.
Start copy of CPU board program automatically.
After a copy, Please turn off machine power and flip back dipswitch [DSW2 to ON] and
[DSW4 to OFF].
4. [Update LCD board control program]
Flip dipswitch [DSW1 to ON] on ATA LCD board. And turn on machine.
Starts initialize
5. [Update LCD board control program]
Turn off machine power And Flip back dipswitch {DSW1 to OFF}.
6. Flip dipswitch [DSW1 to OFF] on CPU board. And turn on machine.
Starts initialize memory.
7. Turn off machine and flip back dipswitch [DSW1 to ON] on CPU board.
Press and keep [MENU] button and turn on machine power.
8. Memory checks at maintenance mode.
9. Re-turn on the machine
Come up [E-120] on display, and press [SET] button for turn off machine power.
10. Press and keep [MENU] button and turn on machine power.
11. Needle setting at maintenance mode.
(”D” for 1
st
needle ,”E” for 12
th
needle ,”F” for check)
12. Exit maintenance mode.( Press [ESC] button for back to drive mode)
Check moving head working correctly.
13. Initialize machine system
14. Machine speed teaching
15.Calender setting
16.end of process
2-4
Initialize memory
2-6
Needle position setting
Instruction book
25-1.2 Initialize machine
Instruction book
3-7 Calendar setting
3-3
Check and all clear a
memory
2-3
UPDATE
PROGRAM