![Hanna Instruments BL100 Series Instruction Manual Download Page 23](http://html1.mh-extra.com/html/hanna-instruments/bl100-series/bl100-series_instruction-manual_3674628023.webp)
23
INST
ALLA
TION
Connecting the Probe to the Pump Controller (Flow Cell Configuration)
• Remove the protective cap and verify if the O-ring (2) is in place.
• Carefully insert the probe (1) into the flow cell adapter (3), paying attention not to damage the
O-ring. Tighten the probe enough to seal in place.
• Cut the tubing (5) to reach between the inlet valve mounted on the pipe and the flow cell inlet.
Mount a metal clamp (6) over the tubing. Push the end of the tubing (5) over the tubing fitting
(4) and secure in place with the metal clamp (6). Enlarge the end of the tubing so that it can be
mounted on the flow cell inlet and move the clamp to secure the assembly.
• Repeat the previous step for flow cell outlet securing the tubing (8) on the tubing fitting (7) with
the metal clamp (9).
Position Description
1
Probe
2
O-ring
3
Flow cell adapter
4
Tubing fitting
5
Tubing
6
Metal clamp
7
Tubing fitting
8
Tubing
9
Metal clamp
Note:
prepare and calibrate the probe prior to installing in the flow cell.