![Hanna Instruments BL100 Series Instruction Manual Download Page 20](http://html1.mh-extra.com/html/hanna-instruments/bl100-series/bl100-series_instruction-manual_3674628020.webp)
20
INST
ALLA
TION
Mounting Recommendations for Saddle
• Select required drill size. See table for dimension details.
Pipe
Drill
• Place the upper part of the saddle (3) on top of the
pipe (5) with the seal (4) placed over the hole.
• Take the lower part of the saddle (6), together with
inserted nuts (7) and align it under the upper part.
• Insert the screws (1) with washers (2) through the
holes and tighten by hand into the mounted nuts.
• Using a wrench, tighten all screws carefully.
Saddle for probe & injector
Thread size
Drill size
Ø 50 mm pipe
½" thread
20 mm - 25.4 mm / 0.79" - 1.00"
Ø 63 mm pipe
½" thread
20 mm - 25.4 mm / 0.79" - 1.00"
Ø 75 mm pipe
½" thread
20 mm - 25.4 mm / 0.79" - 1.00"
Connecting the Probe to the Pump Controller (In-line Configuration)
The probe should be connected to the controller and calibrated before
installation.
Insert the probe and screw it carefully into the saddle, taking care not to
damage the O-ring. Tighten the probe enough to ensure the circuit sealing.
To avoid twisting the cable, unplug probe from socket temporarily while
installing in flow cell or in saddle.