HANLA HGS-100 Technical Manual Download Page 8

 

 

 

HANLA 

IMS 

CO., LTD.

1610-5 SONGJEONG-DONG GANGSEO-GU BUSAN KOREA  
-Tel: 82-51-601-3000  
-Fax: 82-51-831-1850  
-Email: [email protected]

 

 

MT-HGS-100NEW SYSTEM

Rev.9

2010-07-13

Page 8/58

 

  To sample the gas of the BALLAST TANK, the sampling pump(P2) is used. To sample the gas of the PUMP ROOM, the 

sampling pump(P3) is prepared. Each channel is controlled by the solenoid valve control. To regulate the gas flow and 

check the flowrate, the regulation valve and flowmeter are installed. The moisture from the suction of pipe lines is filtered 

by the filter and drained by 

compulsion

 

 

 

The diagram of the gas flow 

Channel Sampling 

  EV1 to EV40 and EV0-1 allow the control of the sampling line for PART1. 

  EV41 to EV48 and EV0-2 allow the control of the sampling line for PART2. 

  P2, P3 are the sampling pumps. 

  EV0-1 allows the cabinet internal atmosphere control, or the P2 pump discharge; In addition, a solenoid valve EV0-1 

allows to control the internal atmosphere of the Analyzing Unit, named channel 0. 

Channel Purging

 

   

  EVA, EVE allows to proceed to an air purge of selected channel; After suction sampling of a channel, an instrument air 

purge is started, in order to correct or prevent ingress of water, moisture, condensation, dust or foreign bodies. 

Calibration 

  EVB, EVF allow to drive the Calibration Gas to the detector(s). 

   

  EVC allows to purge the water trap. 

   

  Gas Detectors(GD) in Main Sampling Line(Ch.1~40): the Hydrocarbon gas Infrared detector is placed upstream P2 

pump(GD on above diagram); other detector(s) is(are) placed downstream P2. 

  Gas Detectors(GD) in PUMP ROOM Sampling Line(Ch.41~48): the Hydrocarbon, O

2

 and H

2

S gas detectors can be 

placed upstream P3 pump(GD on above diagram); other detector(s) is(are) placed downstream P3. 

Summary of Contents for HGS-100

Page 1: ...5 SONGJEONG DONG GANGSEO GU BUSAN KOREA Tel 82 51 601 3000 Fax 82 51 831 1850 Email hanla hanlaims co kr MT HGS 100NEW SYSTEM Rev 9 2010 07 13 Page 1 58 HGS 100 TECHNICAL MANUAL Hydrocarbon Gas Sampl...

Page 2: ...3 Communication 10 1 4 4 Gas detectors 11 1 4 5 Solenoid valves 11 1 4 6 flowmeter regulation valve filter 11 1 4 7 Analyzing Unit adjacent equipments 11 1 4 8 CONTROL UNIT 12 2 OPERATION 13 2 1 NORM...

Page 3: ...est 26 2 9 COMMAND SUMMARY 27 3 INSTALLATION AND COMMISSIONING 35 3 1 MECHANICAL CONNECTIONS 35 3 2 ELECTRICAL CONNECTIONS 36 3 3 COMMISSIONING 37 3 4 CONFIGURATION MENU F5 37 3 5 DETECTOR SETTING cal...

Page 4: ...RM TEST using HOLD function 55 3 14 4 GAS ALARM TEST using HOLD function 55 3 14 5 SYSTEM SHUTDOWN TEST using HOLD function 55 3 15 CHECK OF COMMISSIONING 56 3 15 1 CHECK OF INSTALLATION 56 3 15 2 CHE...

Page 5: ...puts from local gas detectors Controlled Gases are Hydrocarbon gases Oxygen Hydrogen Sulphide Carbon monoxide Sulphur dioxide Nitrogen monoxide Nitrogen dioxide Ammonia Chlorine Hydrides Other on requ...

Page 6: ...on HC gas is monitored Infra red type HC sensor is used for best reliability and maintenance free And in the pump room not only the hydrocarbon but also the Oxygen O2 Hydrogen sulfide H2S gases are mo...

Page 7: ...1 3 1 BLOCK DIAGRAM HGS 100 System has the Analyzing unit Control unit Repeater units Analyzing and Control units are installed in the main panel REPEATER ALARM UNIT CONTROL UNIT ANALYZING UNIT MEASU...

Page 8: ...ART2 P2 P3 are the sampling pumps EV0 1 allows the cabinet internal atmosphere control or the P2 pump discharge In addition a solenoid valve EV0 1 allows to control the internal atmosphere of the Anal...

Page 9: ...to gas type 4 20mA 2 wire or 3 wires output safety class according to their location z Gas concentration alarm levels 2 adjustable Pre Alarm and Alarm z Alarm from Analyzing Unit 1 for Gas Alarm dry...

Page 10: ...rejection of common mode noise To convert the current 4 20 mA to the voltage the load resistor 200 is used That module periodically performs and saves all gas measurements It provides a non volatile m...

Page 11: ...verter of Analyzing Board Control Board displays those data from the analyzing board 1 4 5 Solenoid valves The 8 solenoid valves are installed on the manifold The system uses the 9 sets of manifold fo...

Page 12: ...Analyzing Unit and to set any configuration change The Control Unit is powered by 24 Vdc from the Analyzing Unit One Control Unit can be incorporated in the Analyzing Unit or located in a remote box...

Reviews: