39
Hangar 9 Sundowner 36 ARF
11. Secure the switch in the fuselage using a small
amount of silicone adhesive or two-sided tape. Position the
switch so it does not interfere with the installation of the
motor battery.
Cowling, Propeller and Spinner
Installation - EP Option
Required Parts
Fuselage assembly
Cowling
3mm washer
Fuel tubing (not included)
Propeller (not included)
Spinner assembly (not included)
3mm x 10mm socket head screw (2)
Required Tools and Adhesives
Ruler
Ball driver: 2.5mm
Ball driver: 2.5mm
Hobby scissors
Rotary tool
Sanding drum
Open end wrench: 10mm Hobby knife with #11 blade
1. Check the length of your 2.5mm ball driver. If it is not
at least 4
1
/
2
inches (114mm), you will need to make a small
access opening in the cowl as shown in the next step.
2. (Optional) Use hobby scissors and a rotary tool to
make a 3/8-inch x 3/4-inch (9mm x 19mm) slot in the
bottom of the cowl to access the lower mounting screw if
your ball driver is less than 4
1
/
2
inches (114mm) in length.
3. To make the installation of the lower cowl mounting
screw easier, use a 1/2-inch (13mm) piece of fuel tubing to
keep the screw attached to the ball driver as shown.