37
Hangar 9 Funtana 125 ARF Assembly Manual
Step 13
Use a hobby knife and a #11 blade to remove the covering
from the fuselage for the ignition switch. Mount the switch
using the hardware provided with the switch.
Step 14
Use a hook and loop strap to secure the ignition battery to
the side of the fuselage. Connect the leads from the switch
and battery. Make sure to use string or dental floss to keep
the leads from accidentally disconnecting inside the fuselage.
The battery should be wrapped in 1/4-inch (6mm) foam to
protect it from vibration.
Step 15
Use two tie straps to secure the ignition module to the
engine box. Connect the lead from the module to the switch
harness at this time as well.
Step 16
Connect the Z-bend in the 19
3
/
8
-inch (492mm) throttle
pushrod to the outer hole of the carburetor arm as shown.
Step 17
Slide the throttle pushrod wire into the tube. Position the
engine between the mounts. Use the four 4mm x 15mm hex
head bolts and four 4mm star washers to secure the engine
to the mount. Make sure to place the grounding strap from
the ignition module on one of the bolts so it is grounded to
the case of the engine. Tighten the screws using a 3mm hex
wrench after applying a drop of threadlock on each bolt.
Step 18
Make the necessary connections between the ignition
module and engine. Use a tie wrap or two to keep the wires
organized so they don’t interfere with the operation of the
engine.