1
Required Parts
•.Fuselage.
•.Engine.mount.()
•.8-3.nylon.lock.nut.(4).
•.8-3.blind.nut.(4)
•.#8.washer.(8).
•.Engine
•.8-3.x.1
.
1
/
4
".socket.head.screw.(4)
•.8-3.x.1".socket.head.screw.(4)
Required Tools and Adhesives
•.Hex.wrench:.9/64".
•.Ruler
•.Adjustable.wrench.
•.11/3".socket.wrench
•.Drill.bit:.5/3".(4mm).
•.Drill
•.Phillips.screwdriver
Step 1
Locate.the.engine.mount.and.the.associated.hardware..
Temporarily.install.the.engine.mount.to.the.fuselage.
using.four.8-3.x.1".socket.head.screws,.four.#8.washers.
and.four.blind.nuts..Leave.the.bolts.loose.enough.not.to.
draw.the.blind.nuts.into.the.wood.inside.the.fuselage.
Hint
:.You.can.also.install.the.blind.nuts.
backwards.to.prevent.them.from.pulling.into.
the.wood.on.the.backside.of.the.firewall..
Just.remember.to.move.them.to.their.correct.
positioning.before.moving.to.the.next.section.
Step 2
Temporarily.attach.the.engine.using.four.8-3.x.1
.
1
/
4
".
socket.head.screws,.four.#8.washers.and.four..
nylon.lock.nuts.
Step 3
Position.the.engine.so.the.front.of.the.drive.washer.
is.5
.
9
/
16
".(14mm).from.the.firewall..Tighten.the.bolts.
holding.the.engine.once.the.engine.is.positioned.
Section 4: Engine Installation
Summary of Contents for F6F Hellcat 60 ARF
Page 43: ...43 Notes ...