background image

8

Monterey

4

RIDGE ASSEMBLY

12' Assembly

10' Assembly

Center Rafter Support

Center Rafter Support

Center Rafter Support

Center Spacer Equally

Center Spacer Equally

Center Spacer Equally

(2) 3" Screw

(2) 3" Screw

Ridge Block

Ridge Block

Ridge Block

(2) 3" Screw

(2) 3" Screw

14' Assembly

(2) 3" Screw

(2) 3" Screw

Flush to Bottom

Flush to Bottom

10' Gazebo Ridge Block Pre-Drilled 

Inside Holes Facing Down

2-3/16"

4-1/4"

4-A: 10’ Gazebo - Layout Center Rafter Sup-
port (angled) and Center Support Spacers
equally as shown.  Use (2) 3” screws staggered
as shown into each spacer.  Install 2 solid ridge
blocks as shown with 3” screws.  Note:  Keep
Predrilled holes in Ridge Block to Bottom.

4-A: 12’ Gazebo - Layout Center Rafter Sup-
port (angled) and Center Support Spacers
equally as shown.  Use (2) 3” screws into each
spacer as shown.  Install Hollow Ridge Blocks
as shown with 3” Screws and keep flush to
bottom.

4-A: 14’ Gazebo - Layout Center Rafter Sup-
port (angled) and Center Support Spacers
equally as shown.  Use (2) 3” screws into each
spacer as shown.  Install Hollow Ridge Blocks
as shown with 3” Screws and keep flush to
bottom.

 2 pcs.

Center Rafter Support

2 x 4 x 43-

1

/

4

 3 pcs.

Center Spacer

1

/

2

” x 3-

1

/

2

” x 6”

 2 pcs.

Solid Ridge Block  8 sided

 2 pcs.

Center Rafter Support

2 x 6 x 43-

1

/

16

 3 pcs.

Center Spacer

2 x 6 x 2-

3

/

16

 2 pcs.

Hollow Ridge Block 10 sided

 2 pcs.

Center Rafter Support

2 x 4 x 42-

13

/

16

 3 pcs.

Center Spacer

2 x 6 x 4-

1

/

4

 2 pcs.

Hollow Ridge Block 12 sided

PARTS LIST 10’ GAZEBO

PARTS LIST 12’ GAZEBO

PARTS LIST 14’ GAZEBO

Summary of Contents for 16691

Page 1: ...dden from view like a part under a panel Lumber is graded from only one side Check the part for the most attractive face and make sure to face it to the outside Check all parts Compare parts you have...

Page 2: ...x 82 1 2 with Spacer 22 pcs Corbels 2 x 4 x 14 8 pcs Plywood Gusset Brackets 4 pcs 2 left 2 right Plywood Gusset Brackets 12 pcs Rafters 2 x 6 x 78 3 8 4 pcs Center Rafters 2 x 6 x 81 1 4 2 pcs Ridge...

Page 3: ...included with optional floor kit B Purchase materials to cut and build your own wooden floor NOTE Our Precut Floor Kits have been designed for normal residential use It is characteristic for the floor...

Page 4: ...utside of frame corners as needed Follow local codes for anchoring requirement or see local home center for recommendation HARD SURFACE INSTALLATION Do Not Use the Base Plate in our Floor Kit for Hard...

Page 5: ...e by 12 deep per local code continuous footing around the perimeter of the pad Use wood forms around the perimeter of gazebo foundation area Use rebar as needed Pour concrete and make sure all points...

Page 6: ...ews 2 B Fig 2 Fig 1 PARTS LIST 10 GAZEBO PARTS LIST 12 GAZEBO 10 pcs Pre assembled Wall Panels 1 pcs Pre assembled Square end Wall Panel 1 pc Pre assembled Square end Door Panel 12 pcs Pre assembled W...

Page 7: ...de edge of the Wall Panel by 2 1 2 as shown in Fig 2 This step may require some pulling of the Wall Panel to bring it into proper posi tion Tip to tip measurement on Gussets is 46 7 8 for 10 Gazebo an...

Page 8: ...to Bottom 4 A 12 Gazebo Layout Center Rafter Sup port angled and Center Support Spacers equally as shown Use 2 3 screws into each spacer as shown Install Hollow Ridge Blocks as shown with 3 Screws an...

Page 9: ...ng method as in Step 5 B or 5 C Set assembly on Gussets and attach with 3 screws as in Step 5 D Fig 2 Keep the center on these rafters 44 3 4 apart at the top and bottom In windy conditions have a sec...

Page 10: ...3 screws Into Each Rafter Top and Bottom Top View J1 Fig 1 Fig 2 5 ERECTING RAFTERS CONTINUED 5 C Rafter Rafter 12 14 GAZEBO TOP VIEW 3 Screws Maintain 1 2 Space 3 Screws 1 2 Mark Keep Center Rafter F...

Page 11: ...led holes to keep from splitting 4 1 5 8 Screws into each Ridge Cap 1 5 8 Screws Underside Ridge Cover Fig 1 Fig 2 3 Screws 1 pc Underside Ridge Cover 2 pcs Roof Finial Block 1 1 2x1 1 2x3 1 2 PARTS L...

Page 12: ...shown in Fig 2 Fig 2 Optional Anchoring of Gazebo OPTIONAL ANCHORING ANCHORING GAZEBO Assembled Side Wall and Rafters Anchor or Brackets and Screws Not included in Kit 6 A PARTS LIST Local building d...

Page 13: ...nside of your Gazebo Along each Rafter place a mark 3 4 in on each Rafter to help center Roof Panels as shown in Fig 1 and Fig 2 Set first Roof Panel in place on top of Rafters making top of Roof Pane...

Page 14: ...large roof panel pieces as shown in Fig 1 with Plywood side up Place 6x14 temporary brace between 2 pieces and attach with 6 3 4 screws When installing the Roof Panels the rough sawn cedar side shoul...

Page 15: ...e steps as in 7 A to install all remaining Roof Panels only temporarily nailing in place Once all Roof Panels are in place and fit properly on your Gazebo then nail every 8 with 2 nails 10 model has t...

Page 16: ...f Fascia The 2 shorter 44 3 4 Fascia will go over the door and the opposite side Once all Fascia are in place finish nailing along bottom edge and top of roof panel with five more 1 1 2 Finish Nails A...

Page 17: ...om Outside Edge of Sill Plate Secure with 3 screws 3 Screws 3 4 Note If installing a Screen Kit skip Step 9 and refer to Screen Kit instruction manual before going to Step10 Note If installing sill fr...

Page 18: ...gles consisting of a row of Shingles turned upside down Attach with 3 4 Roofing Nails that are supplied with kit After starter course is completed cut excess shingles off along seam of Roof Panels wit...

Page 19: ...19 Monterey Notes...

Page 20: ...Side and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Timber Buildings To validate your warranty it is necessary to properly maintain your Handy Home Pr...

Reviews: