10
Monterey
5-D
5-D: Attach Rafters 1, 2, 3,4 by inserting 3” Screws through Gusset Bracket, as shown in 5-D Fig. 2, while
holding Rafter in position. Attach remaining rafters (See 5-A) with 3” screws through Gusset Bracket first then
install 3” Screws through top of Rafter into Ridge Assembly as shown in Fig. 1 and as in 5-B or 5-C. Once all
Rafters are in place, make sure (2) 3” screws are connecting Rafters from each end.
VIEW FROM TOP
VIEW FROM BOTTOM
(2) 3"Screws
at slight angle
VIEW FROM BOTTOM
(2) 3"Screws
at slight angle
Centered over corner
of Gusset Bracket
(2) 3" screws
Into Each Rafter
Top and Bottom
Top View
J1
Fig.1
Fig.2
5
ERECTING RAFTERS
CONTINUED
5-C
Rafter
Rafter
12' & 14' GAZEBO
TOP VIEW
3" Screws
Maintain
1/2"
Space
3" Screws
1/2"
Mark
Keep Center Rafter
Flush to Top
5-C: For 12’ and 14’ Gazebo, assemble Rafters by joining Rafters 1,3 and 2,4 on opposite sides to Ridge
Block using 3” screws through predrilled holes in center of Hollow Ridge Block. Leave a 1/2” overhang be-
tween the top and bottom of the rafter and the Ridge block.
Once Rafters 1,3 and 2,4 are connected to Ridge Block, carefully turn over and attach 3” screws through
predrilled holes in Ridge Block into Rafter. With help, place this assembly on top of Gazebo Gussets where
indicated. Please follow step 5-D at this time.
BOTTOM VIEW
3" Screws
Fig.2
Summary of Contents for 16691
Page 19: ...19 Monterey Notes...