background image

Revision:

02-12-07

Run:

1000 Ternes Drive
Monroe, MI 48162
Toll Free 1-800-437-0784

Visit us on the Web at:
www.HandyHome.com

- BEFORE YOU BEGIN -

 STAIN REQUIREMENTS FOR GAZEBOS

   SIZE

  # OF GALLONS

     FLOOR           SCREEN KIT

    10'

    2

1

     .5

    12'

    3

1

     .5

    14'

    4

         1.5

      1

Add for Options

- TREATING YOUR GAZEBO -

Staining...

This Gazebo is constructed of a long-lasting western cedar.
Untreated cedar exposed to sunlight will eventually weather to a
silver-grey color. To validate your warranty and to help keep the
original red color, read your warranty page on maintaining your
Gazebo. Apply a minimum of two coats of oil based penetrating
stain WITHIN 30 DAYS (required by warranty). Some sanding to
remove rough edges and natural wood stains may be required
prior to staining. Your Gazebo roof is not waterproof unless it is
shingled. Caulking the roof seams before shingling will improve the
water resistance of your Gazebo.

Always wear OSHA-APPROVED safety
glasses throughout assembly process

First...

Read these instructions thoroughly before you begin assembly.
Assembly is easiest if you follow the steps in the order shown.
In a drawing, a dotted line represents a part hidden from view (like
a part under a panel).
Lumber is graded from only one side. Check the part for the most
attractive face and make sure to face it to the outside.

Check all parts

Compare parts you have to the list on page 2. If a part is missing,
circle the part in question in the parts list and call us toll-free at
1-800-437-0784.

Assistance required

We recommend that you assemble this Gazebo on level ground in
the location it will be used. Assistance is necessary to handle, fit,
and secure some components.  Two people are needed for some
steps.

Check local zoning

Before starting construction, check with your local building code
official for any required permits, variances, etc.

#16691

Monterey 10’x14’ - 10 sided Gazebo shown with optional Floor Kit (Not Included)
Monterey 12’x16’ - 12 sided Gazebo (not shown)
Monterey 14’x18’ - 14 sided Gazebo (not shown)

Tools required

 Hammer

 #2 Phillips Screwdriver

 6’ Step Ladder

 Tape Measure

 Pencil

Optional tools

 Electric Drill w/ #2 Phillips Tip

 Nail Pouch

 1/8” and 3/16”Drill bit-for predrilled holes

 Wood Glue

Monterey

10’,12’ and 14’

Oval Gazebo Instructions

Made in the U.S.A.

Check Floor Kit Size

Before starting construction on your floor, make sure that you
check in the instruction manual to make sure that you are
building the correct size floor kit for your Gazebo.  See page 3
for more information.

Summary of Contents for 16691

Page 1: ...dden from view like a part under a panel Lumber is graded from only one side Check the part for the most attractive face and make sure to face it to the outside Check all parts Compare parts you have...

Page 2: ...x 82 1 2 with Spacer 22 pcs Corbels 2 x 4 x 14 8 pcs Plywood Gusset Brackets 4 pcs 2 left 2 right Plywood Gusset Brackets 12 pcs Rafters 2 x 6 x 78 3 8 4 pcs Center Rafters 2 x 6 x 81 1 4 2 pcs Ridge...

Page 3: ...included with optional floor kit B Purchase materials to cut and build your own wooden floor NOTE Our Precut Floor Kits have been designed for normal residential use It is characteristic for the floor...

Page 4: ...utside of frame corners as needed Follow local codes for anchoring requirement or see local home center for recommendation HARD SURFACE INSTALLATION Do Not Use the Base Plate in our Floor Kit for Hard...

Page 5: ...e by 12 deep per local code continuous footing around the perimeter of the pad Use wood forms around the perimeter of gazebo foundation area Use rebar as needed Pour concrete and make sure all points...

Page 6: ...ews 2 B Fig 2 Fig 1 PARTS LIST 10 GAZEBO PARTS LIST 12 GAZEBO 10 pcs Pre assembled Wall Panels 1 pcs Pre assembled Square end Wall Panel 1 pc Pre assembled Square end Door Panel 12 pcs Pre assembled W...

Page 7: ...de edge of the Wall Panel by 2 1 2 as shown in Fig 2 This step may require some pulling of the Wall Panel to bring it into proper posi tion Tip to tip measurement on Gussets is 46 7 8 for 10 Gazebo an...

Page 8: ...to Bottom 4 A 12 Gazebo Layout Center Rafter Sup port angled and Center Support Spacers equally as shown Use 2 3 screws into each spacer as shown Install Hollow Ridge Blocks as shown with 3 Screws an...

Page 9: ...ng method as in Step 5 B or 5 C Set assembly on Gussets and attach with 3 screws as in Step 5 D Fig 2 Keep the center on these rafters 44 3 4 apart at the top and bottom In windy conditions have a sec...

Page 10: ...3 screws Into Each Rafter Top and Bottom Top View J1 Fig 1 Fig 2 5 ERECTING RAFTERS CONTINUED 5 C Rafter Rafter 12 14 GAZEBO TOP VIEW 3 Screws Maintain 1 2 Space 3 Screws 1 2 Mark Keep Center Rafter F...

Page 11: ...led holes to keep from splitting 4 1 5 8 Screws into each Ridge Cap 1 5 8 Screws Underside Ridge Cover Fig 1 Fig 2 3 Screws 1 pc Underside Ridge Cover 2 pcs Roof Finial Block 1 1 2x1 1 2x3 1 2 PARTS L...

Page 12: ...shown in Fig 2 Fig 2 Optional Anchoring of Gazebo OPTIONAL ANCHORING ANCHORING GAZEBO Assembled Side Wall and Rafters Anchor or Brackets and Screws Not included in Kit 6 A PARTS LIST Local building d...

Page 13: ...nside of your Gazebo Along each Rafter place a mark 3 4 in on each Rafter to help center Roof Panels as shown in Fig 1 and Fig 2 Set first Roof Panel in place on top of Rafters making top of Roof Pane...

Page 14: ...large roof panel pieces as shown in Fig 1 with Plywood side up Place 6x14 temporary brace between 2 pieces and attach with 6 3 4 screws When installing the Roof Panels the rough sawn cedar side shoul...

Page 15: ...e steps as in 7 A to install all remaining Roof Panels only temporarily nailing in place Once all Roof Panels are in place and fit properly on your Gazebo then nail every 8 with 2 nails 10 model has t...

Page 16: ...f Fascia The 2 shorter 44 3 4 Fascia will go over the door and the opposite side Once all Fascia are in place finish nailing along bottom edge and top of roof panel with five more 1 1 2 Finish Nails A...

Page 17: ...om Outside Edge of Sill Plate Secure with 3 screws 3 Screws 3 4 Note If installing a Screen Kit skip Step 9 and refer to Screen Kit instruction manual before going to Step10 Note If installing sill fr...

Page 18: ...gles consisting of a row of Shingles turned upside down Attach with 3 4 Roofing Nails that are supplied with kit After starter course is completed cut excess shingles off along seam of Roof Panels wit...

Page 19: ...19 Monterey Notes...

Page 20: ...Side and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Timber Buildings To validate your warranty it is necessary to properly maintain your Handy Home Pr...

Reviews: