![background image](http://html1.mh-extra.com/html/hands/5226/5226_operators-manual_3051661020.webp)
PREPARING FOR OPERATION
TRACTION CONNECTIONS
Tractor Hitch
1. The hitch of the
Top Shot
is designed for a standardized tractor hitch. Adjust the drawbar so that it
is 13 to 17 inches above the ground.
2.
Extend or shorten it so that the horizontal distance from the end of the tractor power takeoff shaft to
the center of the hitch pin hole is 14 inches for 540 RPM PTO and 15-3/4” for 1000 RPM PTO as
shown in drawing. An improperly located hitch point may cause damage to the universal joints of the
power takeoff.
3. Secure the drawbar so that the hitch pin hole is directly below the power drive line. Fasten the
Top
Shot
to the tractor drawbar with an appropriate hitch pin with safety locking device. After the connection
is made, remove the hitch jack and secure it to the “Storage Position” on the left side of the Spreader.
If the Top Shot is attached to a tractor with
a clevis hitch (hammer-strap) style draw-
bar, the hammer-strap must be removed
to prevent damage to the IID guarding and
the II telescoping members. [See Figure 1]
If the Top Shot is attached to a tractor with an offset
in the drawbar, be certain it is in the down position
to prevent damage to the IID guarding and the IID
telescoping members. [See Figure 2]
-18-
Summary of Contents for 5226
Page 3: ...1...
Page 5: ...Remove Copy At Perforation 3...
Page 6: ...Intentionally Left Blank 4...
Page 8: ...6 Intentionally Left Blank...
Page 10: ...8 Intentionally Left Blank...
Page 13: ...11 SAFETY INFORMATION...
Page 14: ...SAFETY INFORMATION 12...
Page 16: ...14...
Page 43: ...41 SERVICE NOTES...
Page 44: ...41 SERVICE NOTES...
Page 45: ......
Page 46: ...H S MFG CO products approved for the FEMA SEAL OF QUALITY...