COMPRESSOR INSTALLATION & START-UP GUIDE
REVISION M
4
1. Compressor Crate Unpacking & Inspection
1.1. Inspect crate and compressor for any shipping
damage.
1.2. The compressor is in an easy open crate, cut straps
and lift off crate top from base.
1.3. Use either steel cable or safety ropes to lift the
compressor, see Figure 1. The cable should be
capable of holding up to a minimum of 2 tons.
Use caution while lifting the compressor
Figure 1
Lifting Compressor with Steel Cable
⇒
Make sure that the steel cable does not touch the
Solenoid Valves, Capillary, Oil Heater, Discharge
Temperature Sensor and or Power Terminals, etc
. to prevent damage.
⇒
Use only steel cable or safety ropes to lift the compressor; make sure that the cable/rope has the
proper strength to lift the compressor.
⇒
Keep the compressor horizontal while lifting.
1.4. Check compressor nameplate for correct model and voltage designation.
1.5. To facilitate customer installation requirements, the parts listed in Table 1 are factory supplied in separate boxes
located in the compressor terminal box or packed in the compressor shipping container. Please verify that you
have received all accessory parts.
Table 1: Compressor Accessories & Service Valve Parts
Qty
Description
1
Stop Valve Assembly
1 stop valve, 2 gaskets, 1 charging valve, 4 bolts, 1 half union connector, 1 flare nut, 1 flare seal
bonnet
1
Discharge bushing connector
1
Suction bushing connector
1
Motor Terminal Junction Box Assembly
1 terminal box, 1 motor protection, 2 plastic terminal plugs, 1 reset button, 4 wires
(refer to Figure 4-B)