USER MANUAL
For MULTISCAN P2
Chapter 6 - 2
I. Set up -------------------------------------------
A. Power supply
a
Refer to Gas analyser manual when using the analyser alone without
interfacing with the scanner.
This chapter explains the operation when the gas analyser is used in the
vehicle interfaced with the scanner.
b
Connect the cigarette lighter power cable to the cigarette lighter socket.
And connect the other end to the 3-pin power socket in the rear panel of
the gas analyser
c
Gas analyser begins to warm-up when power is supplied. Warming up
takes 4 to 6 minutes in normal condition. It may take up to 15 minutes
when it is cold and it is dependent to the actual air temperature.