HAMWORTHY HEATING LTD
WESSEX-HE 200 BOILER
500001008/K
iii
9.0 ELECTRICAL
SUPPLY
.................................................................................................. 9
9.1 Mains
Cable
Connection
9.2 Boiler
Wiring
Diagram
9.3
Indication Signals and Volt Free Contacts
10.0
INSTALLATION OF BOILERS
..................................................................................... 10
10.1
General
10.2
Connection of Boilers to the Flue System
10.3
Gas
Connections
11.0
COMMISSIONING AND TESTING
............................................................................... 11
11.1
Electrical
Installation
11.2
Gas
Installation
11.3
Water
Circulation
System
11.4
Lighting the Boiler (Initial Commissioning) and System Leakage Check
11.5
Gas Pressure, Adjustment and Combustion Checks
11.6
Limit Thermostat Adjustment
1
External
Controls
2
Installation
Noise
11.7
User’s
Instructions
12.0 FAULT
FINDING
.......................................................................................................... 13
12.1
Summary of Safety Features
12.2
Fault
Finding
12.3
Causes of Lockouts
13.0 SERVICING
.................................................................................................................. 14
14.0
REPLACEMENT OF FAILED COMPONENTS
............................................................ 18
14.1
RECOMMENDED
SPARES
......................................................................... 21
Appendix ‘A’
Information Relating to Propane Firing ......................................................... 31
FIGURES: -
1
Gas valve Leak test procedure ....................................................................................... 5
2
Schematic Boiler Installations (Typical) ........................................................................ 22
3
Wessex 200 HE Module Waterside Pressure Loss ...................................................... 23
4
Terminal Identification & Mains Cable Layout............................................................... 24
5
Wiring Diagram (Schematic) ......................................................................................... 25
6
Wessex 200 HE Module Layout.................................................................................... 26
7
Sequence Controller Coloured Programme Indicator Disc ........................................... 27
8
Wessex 200 HE Burner Flow System Schematic ......................................................... 27
9
Boiler Dimensions & Clearances .................................................................................. 28
10
Wessex 200 HE Pilot Burner Assembly........................................................................ 29
11
Wessex 400 County Arrangement Drawing.................................................................. 30