8
Assembly (continued)
Locate the Left Side Panel (F), Right Side Panel (E).
Screw the Bolts (AA) through the Plastic Connector to
the Left Side Panel (F) and Right Side Panel (E).
Locate Mantel/Top (G) and lay finished side up on top of
completed assembly.
From the inside, attach the Mantel/Top (G) using Bolt (AA)
through the pre-drilled holes in the Plastic Connector and
hand-tighten.
Use a Phillips head screwdriver to tighten all Bolts
alternating top and bottom, left and right.
Locate Hearth/Base (A) and lie down on scratch free
surface.
Insert one Wood Dowel (CC) into the holes in the
pre-drilled holes on the Hearth/Base (A).
Attach the completed assembly from step 3 to the
Hearth/Base (A).
Screw the Bolts (AA) through the Plastic Connector to
the Left Side Panel (F) and Right Side Panel (E) and
hand-tighten.
3
5
4
Side Panel installation
Mantel/Top installation
Base installation
F
E
AA
Hardware Used
Hardware Used
Hardware Used
Part
Description
Qty
AA
Bolt
6
Part
Description
Qty
AA
Bolt
4
Part
Description
Qty
AA
Bolt
4
CC
Wood Dowel
4
G
AA
AA
A
CC
CC