Hampton
®
H27-10 Direct Vent Freestanding Gas Stove
|
25
25
|
installation
Pipe Length
Round Support
Box/Wall Thimble
Vertical
Terminal
Storm Collar
Flashing
(0-12/6-12)
Ceiling
Firestop
Pipe Length
(included in 46DVA-KHA)
Dura-Vent Horizontal
Termination Installation
Dura-Vent Vertical
Termination Installation
*Adj.Pipe Length
(included in #46DVA-KHA)
*90 Elbow
(included in 46DVA-KHA)
o
*Round Support
Box/Wall Thimble
(included in 46DVA-KHA)
*Horizontal
Termination Cap
(included in 46DVA-KHA)
Wall Thimble
(B) Part # 46DVA-WT
Vinyl Siding
Standoff
(Optional)
Part #46DVA-VSS
Cathedral
Ceiling
Support Box
(D)
Vertical Termination Kit
Part # 46DVA-KVA
(A)
*Horizontal Termination Kit
Part # 46DVA-KHA
Basic
Horizontal Kit
1 90
o
Elbow
1 Wall Thimble Cover
1 Horiz. Sq. Term. Cap
DURA-VENT TERMINATION KIT
Planning Your Dura-Vent
Installation
There are two basic types of Dura-Vent Direct
Vent System installations: horizontal termination
and vertical termination. Confirm the maximum
horizontal run and maximum vertical rise from the
diagrams in the "Venting Arrangement" section.
When planning your installation, it will be nec
-
essary to select the proper length of vent pipe
for your particular requirements. For horizontal
installations, determine the minimum clearance
from the rear of the unit to the wall. It is also
important to note the wall thickness. (The wall
thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired
for "vertical-to-horizontal" type installations.
Warning: Always maintain required
clearances (air spaces) to nearby
combustibles to prevent a fire
hazard. Do not fill air spaces with
insulation.
The minimum clearance requirements between
the outer wall of the vent pipe and nearby
combustible surfaces is 1-1/2", except when
passing through a wall, ceiling, or at the termina
-
tion where the use of a firestop or wall thimble
reduces the required clearance to 1".
Be sure to check the vent termination clearance
requirements from decks, windows, soffits, gas
regulators, air supply inlets and public walkways
as specified in the "Exterior Vent Terminal Loca
-
tions" section and in your local building codes.
To determine the length of vent pipe required
for vertical installations, measure the distance
from the unit flue outlet to the ceiling, the ceiling
thickness, the vertical rise in an attic or second
storey, and allow for sufficient vertical height
above the roof line.
For multi-storey applications, fire stops are
required at each floor level. If an offset is
needed, additional pipe, elbows and supports
will be required.
Do not exceed the maximum number of elbows.
One 90
o
for horizontal terminations and two 45
o
for vertical termination.
AstroCap
Part# 946-523/P
Alternate Horizontal
Termination Caps
Alternate
Horizontal
Riser Vent
Terminal
Part# 640-530/P
The FPI AstroCap
TM
is certified for installations using FPI venting systems
as well as Simpson Dura-Vent® and Direct Vent Pro.
The FPI AstroCap
TM
is the proprietary trademark of FPI Fireplace
Products International Ltd.
Dura-Vent® and Direct Vent Pro are registered and/or proprietary
trademarks of Simpson Dura-Vent Co. Inc.