background image

MAINTENANCE AND REPAIR

 

ATTENTION:

  ANY  OPERATION  REQUIRING  THE  OPERATOR’S  DIRECT  INTERVENTION  (INSPECTIONS, 

MAINTENANCE)  MUST  CARRIED  OUT  WITH  THE  OPERATING  MACHINE  STOPPED,  THE  MOTOR  TURNED 
OFF,  AND  THE  PARKING  BRAKE  ENGAGED.  OUR  EQUIPMENT  MUST  ALSO  BE  PLACED  SECURELY  ON  THE 
GROUND. 

ATTENTION:

  THE  INSTALLER,  OPERATOR  AND  MAINTENANCE  PERSONNEL  MUST  WEAR  THE 

APPROPRIATE  SAFETY  DEVICES  SPECIFIED  BY  THE  PERTINENT  SAFETY  LEGISLATION  IN  EFFECT  IN  THE 
COUNTRY WHERE THE EQUIPMENT IS USED. 

ATTENTION:

 

HAMMER SR

L

 

DENIES  ALL  LIABILITY  IN  THE  EVENT  OF  ACCIDENTS  IF

THE

 

INSTALLER, OPERATOR OR MAINTENANCE PERSONNEL FAIL TO USE THE APPROPRIATE SAFETY 

DEVICES. 

ATTENTION:

 MAINTENANCE AND REPAIR OF THE ATTACHMENT MAY BE PERFORMED ONLY BY QUALIFIED 

PERSON

NE

L. 

CAUTION:  Thin  sprays  of  high  pressure  hydraulic  liquid  can  penetrate  skin.  DO  NOT  use 
your  finger  to  search  for  any  leaks.  DO  NOT  place  your  face  near  suspected  leaks.  To  find 
signs  of  hydraulic  leaks,  place  a  piece  of  cardboard  close  to  the  suspected  leaks  and  then 
inspect  the cardboard  itself.  Should  the  hydraulic  fluid  penetrate  your  skin,  immediately  call 
for  medical help. 

For safe work, it is extremely important for careful inspections and maintenance to be performed regularly as 
follows:  

EVERY TIME THE MACHINE IS USED:  
Control the integrity of attachment. 
Check the integrity of the pipes and the connection of the hydraulic attachments. 

EVERY 40 HOURS OF EQUIPMENT USE: 
Check that the screws are undamaged and securely tightened according to the table attached at the end of 
this manual. 

With  reference  to  UNI  ISO  4406,  THE  LEVEL  OF  FLUID  CONTAMINATION  MUST  BE  CLASS
19/15 OR BETTER ;

With reference to ISO 16889, THE FLUID MUST FEED THE CYLINDER BY PASSING THROUGH
A PRESSURIZED FILTER with features in compliance with UNI ISO 7744 ;

The temperature of the oil in use MUST NEVER EXCEED 70 °C .

CAUTION:

 In case of attachment break down, contact the manufacturer directly or use skilled personnel. 

Do not modify the attachment or its functionality in any way. 

15

Summary of Contents for RH 12

Page 1: ...ROTARY CRUSHER RH 12 INSTRUCTIONS MANUAL...

Page 2: ...2...

Page 3: ...___________________________________________ 14 MAINTENANCE AND REPAIR ______________________________________________ 15 CHANGING THE OIL _______________________________________________ 16 GREASING ___...

Page 4: ...r maintenance operations HAMMER SRL reserves the right to update the machine and instruction manual according to technological progress and state of the art This constitutes no obligation to carry out...

Page 5: ...Oleifici dell Italia Meridionale Lotto G1 70056 Molfetta Ba Italia DECLARES HEREWITH ON ITS RESPONSABILITY THAT THE PRODUCT The Director Valerio MODUGNO COMPLIES WITH THE FOLLOWING RULES EC DIRECTIVE...

Page 6: ...th primary and secondary demolition This interchangeable attachment is mounted on excavators designed for earth moving vehicles TECHNICAL SPECIFICATIONS A mm B mm C mm ROTATION FLOW l min ROTATION PRE...

Page 7: ...table TECHNICAL SPECIFICATIONS indicates the maximum diameter of the metal can be cut UNAUTHORIZED USES NO REPAIR OR MAINTENANCE WHILE THE EQUIPMENT IS FUNCTIONING DO NOT OSCILLATE WHILE CUTTING DO N...

Page 8: ...nnel Operating personnel includes all individuals specifically trained and delegated to the management and operation of the activities listed in the Responsibilities section Transport and Installation...

Page 9: ...ting and be alert to unsafe conditions Do not operate if there are unsafe conditions Stop operation immediately shut down the machine and report the unsafe conditions to the proper authority Excavator...

Page 10: ...the operator s platform Know the pinch and crushing points as well as all rotating components and avoid them during operation Always know where to get assistance in case of an emergency Know where to...

Page 11: ...ls levers for proper operation Rotation bearing Visually check for loose or damaged bolts Know the Work Area Check clearances in the work area Keep all bystanders at a safe distance Do not work under...

Page 12: ...g hooks Make sure that these hooks are secured firmly to allow you to proceed to move the attachment The hooks and cables used for movement must be of the appropriate size for the weight of the attach...

Page 13: ...operation is carried out for the attachments of the equipment rotating system as well as for those of the opening and closing system ATTENTION THE ROTATION SYSTEM must be connected to ONE DELIVERY AN...

Page 14: ...h reference to the diagram below Dimension A Dimension B ROTATION FLOW l min 5 8 ROTATION PRESSURE bar 70 OPEN CLOSE FLOW l min 70 110 OPEN CLOSE PRESSURE bar 200 300 A A B B hydraulic rotation openin...

Page 15: ...leaks To find signs of hydraulic leaks place a piece of cardboard close to the suspected leaks and then inspect the cardboard itself Should the hydraulic fluid penetrate your skin immediately call fo...

Page 16: ...ld be changed when the gear motor is hot We recommend checking the oil level If more than 10 of the oil needs to be added thoroughly check that the unit is not losing oil Avoid mixing different types...

Page 17: ...4 TIMES MOVE AWAY FROM THE EQUIPMENT AND USE THE EXCAVATOR CONTROLS TO ROTATE IT FOR 10 SECONDS THEN GREASE AGAIN EVERY 40 HOURS OF OPERATION GREASE THE ROTATION MOVEMENT AT POINT C SQUEEZE THE GREAS...

Page 18: ...h the current regulations of the country where the machine is put to use ADVICE REGARDING THE PROPER TREATMENT OF WASTE MATERIAL Ferrous material such as aluminium and copper to be treated as recyclab...

Page 19: ...HYDRAULIC SCHEMATIC 19...

Page 20: ...to Regulation DIN 267 bolt hexagon coarse fine coarse fine coarse fine coarse fine mm mm mm Nm Nm Nm Nm Nm Nm M8 13 1 25 1 0 25 27 35 38 42 46 M10 17 1 5 1 25 50 53 70 74 84 89 M12 19 1 75 1 5 85 89 1...

Page 21: ...I I RH12 TI 21...

Page 22: ...68 69 1 19 Slewing ring 1 20 Fixing bolt for slewing ring 36 21 Nipples 2 22 Body cover 2 23 Pin for cylinder body 1 24 Bolt 3 25 Nut 3 26 Pin for body jaw 1 27 Pun for cylinder jaw 1 28 Knife 2 29 Kn...

Page 23: ...c rotation motor 1 52 Rotation valve 1 53 Gear 1 54 Gear washer 1 55 Fixing bolt for gear 1 56 Bolt for rotation valve 4 57 Nipples 2 58 Washer 2 59 Nipples 1 60 Nipples 1 61 Washer 2 62 Upper body fo...

Page 24: ...POS DESCRIPTION N ROTATION KIT 01 01 MOTOR 01 02 FLANGE 01 03 BEARING 01 04 GEAR 01 05 WASHER 01 06 SHIM 01 07 SEEGER 01 08 BOLT 02 09 WASHER 08 10 GREASER 01 11 BOLT 06 12 BOLT 01 13 WASHER 01 24...

Page 25: ...25...

Page 26: ...STANDARD 26...

Page 27: ...LT 08 09 HOSE FITTING 02 10 FLEXIBLE HOSE 02 11 DISTRIBUTION UNIT 01 12 SEAL 04 13 PRESSURE CHECKING 02 14 CAP 02 15 HOSE FITTING 04 16 NIPPLES 02 17 VALVE 02 18 FLEXIBLE HOSE 01 19 FLEXIBLE HOSE 01 2...

Page 28: ...OPTIONAL _1 28...

Page 29: ...HOSE FITTING 02 10 FLEXIBLE HOSE 02 11 DISTRIBUTION UNIT 01 12 SEAL 04 13 PRESSURE CHECKING 02 14 02 15 HOSE FITTING 04 16 NIPPLES 02 17 VALVE 02 18 FLEXIBLE HOSE 01 19 FLEXIBLE HOSE 01 20 EXTENSION 0...

Page 30: ...POS DESCRIPTION N 01 HOSE FITTING 01 02 HOSE FITTING 02 03 HOSE 01 04 NIPPLES 01 05 GREASER 01 30...

Page 31: ...01 02 REED 01 03 FRONT CLOSURE HEAD 01 04 PISTON 01 05 PIN 02 06 BUSHING 04 07 GUIDE RING 02 08 SEAL 01 09 SEAL 01 10 SEAL 02 11 GUIDE RING 02 12 SEAL 01 13 SEAL 01 14 SEAL 01 15 SEAL 01 16 GUIDE RIN...

Page 32: ...Memo 33...

Page 33: ......

Page 34: ......

Reviews: