Document #101-0011
8
1/09/07
IV. TESTING
After installation, a short test may be performed to verify correct installation.
For testing, be sure Switch #1 is off.
Should this unit fail to operate accordingly, check for an error code and refer to the Error Code List
on page 12.
TEST
DESIRED RESULT
Turn on unit.
Version is displayed for approximately 3
seconds. The display changes to 00 and
then counts to 49 rapidly before stopping
at the flashing decimal point indicating the
unit is ready.
Insert bill.
Payout proper change for each bill.
Test with a quantity of
bills.
Should accept a variety of bills with
acceptance rate in the 90 percentile.