Supplied By www.heating spares.co Tel. 0161 620 6677
8
a)
Re-assemble all components in reverse order.
b)
Check that all joints and seals are correctly fitted.
c)
Turn on the gas and electricity supply and light the appliance,
as described in section 5.2.
d)
Re-perform a combustion check, as described in section 6.1.
e)
Check the operation of the appliance in both CH and DHW
modes as applicable.
f)
Remove the manometer and tighten the inlet pressure test
point sealing screw.
g)
Test for gas tightness.
6.8
RE-ASSEMBLY & RE-COMMISSIONING
a)
Ensure the fascia panel is placed into the upright position and
secure with the two screws.
b)
Re-fit the front casing panel.
c)
Return all appliance and external controls (if fitted) to their
original settings.
6.9
FINAL CHECKS
28
MAINS COLD INLET
CONICAL FILTER
SEALING WASHER
FLOW REGULATOR
FLOW SWITCH
26
751094 ACE HE INST MANUAL:751094 ACE HE 28/9/10 09:45 Page 28