background image

97883C (Rev. A - 4/04)

BFMRQ*A

PAGE 2

FIG. 3

WALL FRAME INSTALLATION INSTRUCTIONS

BEFORE STARTING THE INSTALLATION, PLEASE CHECK YOUR INSTALLATION FOR COMPLIANCE

WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES

1. At 30" above the finished floor, cut a rectangular wall opening 17-1/8" wide by 52-1/4" high.  This is

    required to obtain a rim height of 34-1/2" and 36" bubbler spout height, which is in compliance with

    ANSI Standard A117.1 (See Fig. 3)

2. Reinforce wall opening on all sides so that it will adequately support the water cooler.  

IT MUST

    SUPPORT UP TO 150 LBS.

 and provide a means of securing the frame assembly in place.

    

NOTE:

 Building construction must allow for adequate air flow on both sides and top of remote chiller unit.

    

4" MINIMUM IS REQUIRED.

3. Install rough-in plumbing to fountain. See Fig. 4 for location of supply water inlet to chiller and for location

    of waste water outlet.

4. Install shelf support rods on wall frame assembly.  These rods are located in the chiller shelf package.

    To install chiller shelf, place shelf on chiller support bracket and attach to support rods.

    Secure front edge of the shelf to support bracket using two (2) provided 5/16" x 3/4" long bolts and

    nuts.  Tighten securely.

5. Install frame assembly in the wall opening with front edge flush with finished wall face.  Secure frame

    through holes in top and sides to wall support members with 5/16" diameter fasteners (bolts or lag

    screws) as required by wall constructions. Fourteen (14) bolts/screws are required. 

CAUTION: BE

    SURE THAT FRAME ASSEMBLY IS SQUARED IN ITS LOCATION AND DO NOT USE LESS THAN

    REQUIRED QUANTITY AND SIZE (DIAMETER) OF FASTENERS.

6. Install electrical conduit.  Figure 4 shows electrical conduit connection location.

*

30" (762mm) to bottom of wall cutout required to obtain

 34-1/2"(876mm) rim height (Check local codes)

Summary of Contents for BFMRQ*A Series

Page 1: ...THE GROUNDING OF ELECTRICAL EQUIPMENT SUCHAS TELEPHONE COMPUTERS ETC TOWATER LINES IS A COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTOAFOUNTAIN CREATING AN ELECTROLYSIS WHICH CAUSESA METALLIC TASTE ORAN INCREASE IN THE METAL CONTENT OF THE WATER THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALSAS I...

Page 2: ...for location of supply water inlet to chiller and for location of waste water outlet 4 Install shelf support rods on wall frame assembly These rods are located in the chiller shelf package To install chiller shelf place shelf on chiller support bracket and attach to support rods Secure front edge of the shelf to support bracket using two 2 provided 5 16 x 3 4 long bolts and nuts Tighten securely 5...

Page 3: ... to meet local codes see Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHILLER WATER INLET SHUT OFF VALVE BY OTHERS C 1 1 4 O D WASTE WATER OUTLET TUBE TRAP NOT FURNISHED D ELECTRICAL INLET ...

Page 4: ... 64 ID washers See Figs 8 9 6 Install waste tube assembly Align threaded portion of drain tube assembly with drain hole in basin Place rubber gasket between drain assembly and basin Screw in drain plug from above and tighten securely Snap strainer plate into drain plug See Fig 13 7 Make connection between remote chiller outlet tube and fountain Outlet port is marked on the chiller 1 4 O D copper t...

Page 5: ...97883C Rev A 4 04 BFMRQ A PAGE 5 FIG 7 FIG 8 FIG 9 18 31 30 32 28 29 ...

Page 6: ...97883C Rev A 4 04 BFMRQ A PAGE 6 FIG 10 FIG 11 TO BUBBLER 26 27 25 26 3 1 SEE FIG 6 SEE FIG 12 14 SEE FIG 13 5 4 6 7 2 18 CHILLER OUTLET CHILLERINLET ...

Page 7: ... In Line Strainer Union 1 4 Poly Tubing Cut To Length Washer Flat Washer Flat 10 SS Wing Nut 10 24 Screw 8 x 75 Basin Bracket Screw 10 24 x 62 HHMS 23 24 21 FRONT PANEL 20 22 19 TROUBLE SHOOTING AND MAINTENANCE Orifice Assy Mineral deposits on orifice can cause water flow to spurt or not regulate Mineral deposits may be removed from the orifice with a small round file not over 1 8 diameter or smal...

Page 8: ...97883C Rev A 4 04 BFMRQ A PAGE 8 THIS PAGE INTENTIONALLY LEFT BLANK ...

Reviews: