97883C (Rev. A - 4/04)
BFMRQ*A
PAGE 2
FIG. 3
WALL FRAME INSTALLATION INSTRUCTIONS
BEFORE STARTING THE INSTALLATION, PLEASE CHECK YOUR INSTALLATION FOR COMPLIANCE
WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES
1. At 30" above the finished floor, cut a rectangular wall opening 17-1/8" wide by 52-1/4" high. This is
required to obtain a rim height of 34-1/2" and 36" bubbler spout height, which is in compliance with
ANSI Standard A117.1 (See Fig. 3)
2. Reinforce wall opening on all sides so that it will adequately support the water cooler.
IT MUST
SUPPORT UP TO 150 LBS.
and provide a means of securing the frame assembly in place.
NOTE:
Building construction must allow for adequate air flow on both sides and top of remote chiller unit.
4" MINIMUM IS REQUIRED.
3. Install rough-in plumbing to fountain. See Fig. 4 for location of supply water inlet to chiller and for location
of waste water outlet.
4. Install shelf support rods on wall frame assembly. These rods are located in the chiller shelf package.
To install chiller shelf, place shelf on chiller support bracket and attach to support rods.
Secure front edge of the shelf to support bracket using two (2) provided 5/16" x 3/4" long bolts and
nuts. Tighten securely.
5. Install frame assembly in the wall opening with front edge flush with finished wall face. Secure frame
through holes in top and sides to wall support members with 5/16" diameter fasteners (bolts or lag
screws) as required by wall constructions. Fourteen (14) bolts/screws are required.
CAUTION: BE
SURE THAT FRAME ASSEMBLY IS SQUARED IN ITS LOCATION AND DO NOT USE LESS THAN
REQUIRED QUANTITY AND SIZE (DIAMETER) OF FASTENERS.
6. Install electrical conduit. Figure 4 shows electrical conduit connection location.
*
30" (762mm) to bottom of wall cutout required to obtain
34-1/2"(876mm) rim height (Check local codes)