INSPECTION 
Inspect  the  water  cooler,  water  fountain  and  cartons  for  evidence  of  rough  handling  and  concealed  damage.  Damage claims should be filed 
with the carrier. 

B.

 

TO PUT WATER COOLER AND FOUNTAIN INTO SERVICE 

1.

 

NOTE:  The following states require a licensed plumber to install cooler; AG, GA, MA, MI, OK, RI, SC, SD, TX, VT and WI. 
CA, KS, MN, NM and OR allow for a state-registered installer or contractor as well.  State and local plumbing codes may prohibit use 
of saddle tapping valves for water line connection in some applications.  All connections must conform to applicable plumbing codes. 

2.

 

The P8ACSL/ADA8ACB is composed of a water cooler and a water fountain. The water cooler contains the refrigeration system and is 
always mounted on the right side. This unit can be configured with the water cooler high or low.  Refer to proper roughing in drawing 
for  location  of  plumbing  and  electrical  service.    Filter  units  have  additional  instructions  on  a  label  inside  fountain  side  access  panel.  
Read these before installing unit.  This drinking water cooler is designed to be operated at a water supply line pressure of up to 100 psi 
(690 kPa).  A pressure regulator must be installed in front of the unit’s water inlet if the water pressure (including any possible pressure 
spikes) could exceed 100 psi (690 kPa). 

3.

 

FLUSH BUILDING WATER SUPPLY BEFORE INSTALLING UNIT. 

4.

 

Install wall hangers as shown on the desired roughing in drawing.  Wall hangers are shipped fastened to the backs of each unit.  Units 
with factory installed filters have additional instructions on a label inside of the access panel.  Read these before installing unit. 

5.

 

To  configure  this  cooler  for  right  side  high  or  right  side  low  installation,  refer  to  details  below.    Bottom  screws  of  the 
appropriate  side  panel  may  be  temporarily  removed  to  install  patch  plate.    Assemble  drains  as  shown  below,  matching  the 
position of the gaskets to the contour of the cooler tops. 

6.

 

Mount the water cooler on the right hanger. 

7.

 

Straighten  inlet  “Water  In”  tube  in  water  fountain.    Mount  water  fountain  on  left  side  hanger  while  routing  “Water  In”  tube  through 
access hole to water cooler.  Remove plug from “Drain/Remote Cold Water” connection and insert “Water In” tube. 

8.

 

All provided waste drain parts for field installation are packed in the water fountain.  Assemble drain per appropriate roughing 
in  drawing.    The  short  leg  of  the  crossover  piece  will  be  on  the  water  cooler  side.    When  unit  has  an  internal  waste  trap,  it 
should  be  wrapped  with  insulating  tape  to  prevent  sweating.    Use  of  1-3/4”  knockout  for  a  waste  line  is  not  recommended 
because of potential conflict with ADA* toe space requirements.  Check with your local building code inspector for approval. 

9.

 

Install  a  shut  off  valve  in  water  supply  line.    Remove  strainer  from  cooler  “Water  Supply”  tube.    Solder  3/8”  inlet  tube  extension 
(furnished)  with  lead  free  solder  to  “Water  Supply”  tube  and  insert  strainer  in  open  end  of  extension.    Connect  extension  to  shut  off 
valve.  To allow access to strainer for service, this connection should not be a solder or flare joint.  To ease removal of strainer, a sheet 
metal screw may be lightly threaded into the open end. 

10.

 

Rotate fan blade by hand to see that it is free of obstructions. 

11.

 

Check available power supply against water cooler data plate to assure correct electrical service.  This drinking water cooler is intended 
to  be  connected  to  a  20A  minimum  ground  fault  circuit  interrupting (GFCI) device to meet UL requirements.

  

Plug power supply cord 

into  wall  outlet.    The  rear  most  1-3/8  diameter  knockout  in  frame  bottom  is  for  an  externally  located  electrical  supply.    Make  sure 
knockout  hole  edge  is  smooth  and  free  of  any  burrs.    Use  of  Heyco  bushing  #2184  in  knocked  out  hole  is  recommended  to  prevent 
damage to service cord and to close up excess opening around cord.  Route cord so it does not interfere with ADA* space requirements. 

12.

 

To fill cold water tank on water cooler, open water supply line shut-off and push any one of front pushbuttons to allow water to flow to 
bubbler.    On EE model, actuate solenoid by holding one hand approximately 3 inches from infrared sensor.  Run water until stream is 
free of bubbles. 

13.

 

To adjust bubbler stream: 

a)

 

All pushbutton models are equipped with a cartridge regulator.  The P8ACSL/ADA8ACB and PF8ACSL/ADAF8ACB have a slot 
in  the  shelf  below  the  pushbuttons.    Insert  a  screwdriver  in  this  slot  to  adjust  regulator.    Turn  adjustment  clockwise  to  increase 
stream height.  To access PV8ACSL and PFV8ACSL adjustment, remove bezel and button from front of cooler. 

b)

 

Electric eye (EE or HF) models have regulator built into bubbler.  If adjustment is needed, insert 5/64 wrench approximately 1-1/8" 
into  bubbler  nozzle  opening  until  it  bottoms  out  and  is  seated  in  adjustment  screw.    Turn  adjustment  screw  clockwise  to  reduce 
stream height or counterclockwise to increase height.  Note, less than one turn is required to go from a closed to a wide open flow. 
 Do not overtighten adjuster in closed position as stripping the hex impression in adjustment screw may result. 

14.

 

To adjust beam range of sensor (EE or HF models only): 

a)

 

Shut off water and power supplies. 

b)

 

Remove two screws from top front. 

c)

 

To  adjust  sensing  distance,  use  a  mini-screwdriver  (3.0mm  flat  tip  or  smaller)  and  rotate 
adjustment  potentiometer  screw  on  side  of  sensor.    Turn  clockwise  to  sense  objects  further 
away.  This is represented by thicker end of curve on sensor label.  The screw can be turned 
a maximum of ¾ turns.  The sensor has a maximum range of approximately 30”.  It is factory set at 15”. 

d)

 

NOTE: Do not turn adjustment as high as it can go.  If you do the sensor will lock on until you turn sensing distance back down. 

e)

 

There  is  an  adjustable  on-time delay of 0.5 seconds to prevent nuisance actuation of solenoid valve should someone walk by.  To 
adjust on-time delay, rotate blue knob on timer clockwise.  The maximum on-time delay is 1 second.  After drinking, the water will 
shut  off  immediately  after  walking  away.    Maximum  run  time  is  30  seconds  should  someone  tamper  with  the  sensor.    NOTE:  
Walls with a reflective finish, i.e., ceramic tile, across from sensor may cause false actuation no matter what sensor adjustment is 
for distance.  Therefore, do not install unit in such an area or dull surface of wall so it will not reflect light. 

Adjustment 
potentiometer for 
sensing distance 

Summary of Contents for PACSL

Page 1: ...ccess to strainer for service this connection should not be a solder or flare joint To ease removal of strainer a sheet metal screw may be lightly threaded into the open end 10 Rotate fan blade by han...

Page 2: ...r water cooler D RAIN REMO TE COLD WATER tube then push and hold push button on the wate r cooler until wate r cooler is completely drained Pla ce container under wate r fountain WATER IN tube then p...

Page 3: ......

Page 4: ......

Page 5: ...e product line that mounts directly above Versacooler I and II products If the cooler outlet does not have two useable plugs an outlet splitter will need to be used If installed onto a refrigerated co...

Page 6: ...ver 15 torx bit driver 38 of OD plastic tubing with 19 of sponge tubing insulation included with Versafiller ready coolers Anti splash grate Drip tray What s Included Tools required Installation instr...

Page 7: ...Oasis PWEBF Versacooler II Models PAC P8AC with Hands Free VersaFiller Section 2 Rough In Drawing...

Page 8: ...asis PWEBF Versacooler II Split Level Models with Hands Free VersaFiller Section 2 Rough In Drawing On split level models the VersaFiller must be mounted on the low unit in order to meet ADA guideline...

Page 9: ...ligned with the left side of unit and wall SEE NEXT PAGE FOR TEMPLATE 4 Mark hole location 5 Remove top from unit Template Mark hole location Drill Install bushing Remove top from cooler by removing s...

Page 10: ...LER TOP USE THIS TEMPLATE TO MARK THE HOLE LOCATION ON COOLER TOP 3 1 4 from side 2 1 8 from back Mark this center point on the top Remove the top from the cooler Then create a 7 8 diameter hole throu...

Page 11: ...d water from the cooling tank to the Versafiller OD tube to connect to Versafiller Note If you are retrofitting the Versafiller to an existing cooler follow the instructions starting on the next page...

Page 12: ...branch of the tee will connect to the Versafiller If a filter is being installed cut a piece of tubing about 3 long to insert flow switch right after filter and before tee This allows Versafiller cou...

Page 13: ...tank is non pressurized then go to the Pressurizing the cooling tank addendum section Otherwise proceed to step 1 below Non pressurized units are single units made since December of 2009 Refer to the...

Page 14: ...branch of the TEE Connect the other end of the TEE to the tank outlet tubing tube that was disconnected from the elbow 32 tubing 6 tubing 4 Route the TEE and tubing under the waste drain and connect t...

Page 15: ...ube with a tubing cutter Cut where there is at least 1 inch of straight tubing on each side of the cut 4 Install TEE fitting by connecting the copper tubing to each end Then install the 32 piece of pl...

Page 16: ...also pass through this bushing C Mounting the frame to the wall 1 Place rubber gasket on top of the cooler so it is centered left right and against the wall Section 3 Installation Final steps for bot...

Page 17: ...he proper securing location Make sure to pull the plastic tubing and flow switch wire if applicable up through the hole in the frame 4 Slide sponge tubing insulation over water line Connect the tubing...

Page 18: ...installation Torx screws 5 Set the VersaFiller cabinet into place As you do feed the terminals on the power supply power cord through the bushing on the cooler top MAKE SURE the cabinet fits into the...

Page 19: ...ug in bottle filler cord The program should be set up specific for that installation See the program guide on the next page Section 3 Installation 10 Turn ON water supply and check for leaks Place a c...

Page 20: ...for FILTERED UNIT press and hold button for about 3 seconds Press button for an instant to advance to next menu item 5 If you wish to reset filter life counter or bottle counter press and hold button...

Page 21: ...ater valve inlet JG elbow located left side of water valve facing the front of the cooler Set tubing aside careful to not contaminate water contact end Unplug tubing from JG elbow leading to cooling t...

Page 22: ...G elbow leading to the cooling tank from step 2 STEP 3 STEP 4 Unplug tubing that is connected to the water valve outlet JG elbow located on the right side of valve facing the cooler STEP 5 Connect tub...

Page 23: ...elbow on the right side of the valve be sure to rout the tubing under existing tubing installed in step 4 as shown Step 8 Using tubing that is connected to the JG elbow left side of valve done in step...

Page 24: ...lor are registered trademarks owned or licensed by Elkay Sales Inc and or its parent Elkay Manufacturing Company 2013 LVD Acquisition LLC Electronics quick reference guide Press and hold button for 3...