background image

PAGE 10

96812C (Rev. B - 6/04)

4590FR-FTN

Detail B

13

15

2

14

5

3, 11

4

12

5

6

6

5

13

15

10

See Detail B

FIG. 4

FIG. 5

Stream Height

Adjustment

Summary of Contents for 4590

Page 1: ...OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE COMPUTERS ETC TO WATER LINES IS A COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRIC...

Page 2: ...cap may be removed for servicing the valve 5 We recommend that the top of the column be flush or slightly above the top height of the concrete pad 6 You should test the unit before you backfill Simply...

Page 3: ...E BOTTOM COVER C 1 PVC DRAIN D PRESSURE FITTING 1 1 4 x 3 4 E CONNECTOR 1 1 4 TO 1 1 4 F 1 1 4 DRAIN TUBE G AIR CONTROL LINE H 1 4 WATER LINE J CONNECTOR FOR AIR CONTROL LINE SITE PREPARATION DETAIL F...

Page 4: ...STALLING 97243C SINGLE VALVE CONTROL ASSY 1 Prepare trench for water supply and waste drain lines if required by local codes The hole should be deep enough to accommodate the PVC column and 5 cubic fe...

Page 5: ...Gasket Clamp Hose Drain Gasket Bubbler Tube Assy Set Screw 8 32 x 125 Socket Head Screw 10 24 x 75 Strainer Plate Basin Bubbler Push Button Actuator Drain Tube Regulator Holder Pressure Fitting 1 1 4...

Page 6: ...column to fit desired bury depth Set PVC column in excavating pit 2 Lay drain lines and water supply lines Provide service shut off valve for maintenance Flush the water supply line before attaching t...

Page 7: ...PAGE 7 96812C Rev B 6 04 4590FR FTN SUGGESTED SITE PREPARATION DETAIL FOR THE 4590FR FTN WHEN USING THE SANITARYFR1 VALVE FIG 1...

Page 8: ...TED SITE PREPARATION DETAIL FOR THE 4590FR FTN WHEN USING THE SANITARYFR1 VALVE 1 1 4 DRAIN TUBE SUPPLIEDWITHFTN 1 1 2 DRAIN TUBE SUPPLIEDBYINSTALLER Detail A LEGEND A ACCESS PANEL B REMOVABLE BOTTOM...

Page 9: ...ert the 1 4 O D tube Label E into the 1 4 union provided with valve assembly Insert the 1 4 O D water line coming from the fountain into union Trim any excess length Step 4 Insert the 1 4 O D tube Lab...

Page 10: ...PAGE 10 96812C Rev B 6 04 4590FR FTN Detail B 13 15 2 14 5 3 11 4 12 5 6 6 5 13 15 10 See Detail B FIG 4 FIG 5 Stream Height Adjustment...

Page 11: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 NS PARTNO Hex Nut 3 8 16 Single Valve Regulator Holder Regulator Nut Poly Tubing 1 4 Cut To Length To Bubbler Poly Tubing 1 8 Cut To Length To Actuator Canist...

Page 12: ...ly hose coils into the bottom of the PVC column without any kinks and double check that the valve is positioned fully at the bottom of the PVC column Cap the PVC column Continuous Bubbler Flow Insure...

Reviews: