Halsey Taylor 4410 Owner'S Manual Download Page 7

PAGE 7

4410FR-FTN

97733C (Rev. G - 04/04)

SUGGESTED SITE PREPARATION DETAIL FOR THE

4410FR FTN. WHEN USING THE SANITARYFR1 VALVE

FIG. 1

Summary of Contents for 4410

Page 1: ...ICAL EQUIPMENT SUCH AS TELEPHONE COMPUTERS ETC TO WATER LINES IS A COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBAC...

Page 2: ...emoved for servicing the valve 5 We recommend that the top of the column be flush or slightly above the top height of the concrete pad 6 You should test the unit before you backfill Simply blow on the...

Page 3: ...VABLE BOTTOM COVER C 1 PVC DRAIN D PRESSURE FITTING 1 1 4 x 3 4 E CONNECTOR 1 1 4 TO 1 1 4 F 1 1 4 DRAIN TUBE G AIR CONTROL LINE H 1 4 WATER LINE J CONNECTOR FOR AIR CONTROL LINE SITE PREPARATION DETA...

Page 4: ...NSTALLING 97243C SINGLE VALVE CONTROL ASSY 1 Prepare trench for water supply and waste drain lines if required by local codes The hole should be deep enough to accommodate the PVC column and 5 cubic f...

Page 5: ...7243C 45787C 45788C 45789C 45790C 55960C 75565C 75521C 75596C 56092C 56123C 28091C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 NS NS NS NS NS Drain Gasket...

Page 6: ...mn Additional porous fill and drain pipe may be required due to local ground conditions Cut the PVC column to fit desired bury depth Set PVC column in excavating pit 2 Lay drain lines and water supply...

Page 7: ...PAGE 7 4410FR FTN 97733C Rev G 04 04 SUGGESTED SITE PREPARATION DETAIL FOR THE 4410FR FTN WHEN USING THE SANITARYFR1 VALVE FIG 1...

Page 8: ...SITE PREPARATION DETAIL FOR THE 4410FR FTN WHEN USING THE SANITARYFR1 VALVE 1 1 4 DRAIN TUBE SUPPLIEDWITHFTN AIR GAP ASSY SUPPLIEDWITHVALVE 1 1 2 DRAIN TUBE SUPPLIEDBYINSTALLER Detail A LEGEND A ACCE...

Page 9: ...ert the 1 4 O D tube Label E into the 1 4 union provided with valve assembly Insert the 1 4 O D water line coming from the fountain into union Trim any excess length Step 4 Insert the 1 4 O D tube Lab...

Page 10: ...PAGE 10 4410FR FTN 97733C Rev G 04 04 Detail B 13 15 2 14 5 3 11 4 12 5 6 6 5 13 15 10 See Detail B FIG 4 FIG 5 Stream Height Adjustment...

Page 11: ...older Regulator Nut Poly Tubing 1 4 Cut To Length To Bubbler Poly Tubing 1 8 Cut To Length To Actuator Canister Trap Adaptor 1 1 2 x 1 1 4 Air Gap Assy Fitting 1 2 Union w Strainer Regulator Fitting E...

Page 12: ...ton to the valve Make sure the air tubing compression nut is hand tight Disconnect air tube from push button Place finger over air outlet Push button to test diaphragm Tighten diaphragm cap screws Rep...

Reviews: