Haier HSU-18CRA03-T Installation Manual Download Page 8

It becomes high midway.

The end is immersed

in water.

It waves.

The gap with the ground

is too small

Less than 5cm

There is the bad smell

from a ditch

1.Power Source Installation

2.Cutting and Flaring Work of Piping

3.On Drainage

Check for Installation and Test Run

Check Items for Test Run

The power source must be exclusively used for air conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place, please install an

earth leakage breaker.

For installation in other places, use a circuit breaker as far as possible.

Pipe cutting is carried out with a pipe cutter and burs must be removed.

After inserting the flare nut, flaring work is carried out.

Please install the drain hose so as to be downward slope without fail.

Please don't do the drainage as shown below.

Please pour water in the drain pan of the indoor unit, and confirm that drainage is

carried out surely to outdoor.

In case that the attached drain hose is in a room, please apply heat insulation

to it without fail.

Please kindly explain to our customers how to operate through the instruction manual.

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of

indoor and outdoor firmly inserted

to the terminal block?

Is the connecting wiring of indoor

and outdoor firmly fixed?

Is drainage securely carried out?

Is the earth line securely

connected?

Is the indoor unit securely fixed?

Is power source voltage abided

by the code?

Is there any noise?

Put check mark       in boxes

Is the lamp normally lighting?

Are cooling and heating (when

in heat pump) performed normally?

Is the operation of room temperature

regulator normal?

8

Liquid side

Pipe diameter(    ) Size A(mm)

6.35mm(1/4")

0.8~1.5

Gas side

12.7mm(1/2")

1.2~2.0

Gas side

9.52mm(3/8")

1.0~1.8

Correct

Incorrect

Lean Damage of flare Crack

Partial Too outside

Flare tooling die

A

Summary of Contents for HSU-18CRA03-T

Page 1: ...Drain hose Heating insulating material Piping hole cover Arrangement of piping directions Rear left Rear right Left Below Right The marks from to in the figure are the parts numbers The distance betw...

Page 2: ...ptacle with enough space around Refer to drawings Place where the distance of more than lm from televisions radios wireless apparatuses and fluorescent lamps can be left In the case of fixing the remo...

Page 3: ...ticle When the mounting plate is first fixed for the position of wall hole Fix to side bar and lintel a mounting bar Which is separately sold and then fasten the plate to the fixed mounting bar Make a...

Page 4: ...ody aslant from the underside and then put it down perpendicularly 1 Insert the drain hose into the dent of heat insulation materials of indoor unit 2 Insert the indoor outdoor electric cable from bac...

Page 5: ...h the wiring cover Note When connecting the cable confirm the terminal number of indoor and outdoor units carefully If wiring is not correct proper operation can not be carried out and will cause defe...

Page 6: ...wiring is not correct proper operation can not be carried out and controller may be damaged If the drain elbow is used please attach it as figure Note Only for heat pump unit Drawing for the installat...

Page 7: ...ing to the following list Piping length Additional amount 5m 7m No need 40g 10m 100g for 9k 12k 18k Push the air out of the indoor unit and piping as followes 1 Remove the valve cap on 2 way valve in...

Page 8: ...pan of the indoor unit and confirm that drainage is carried out surely to outdoor In case that the attached drain hose is in a room please apply heat insulation to it without fail Please kindly expla...