background image

Outdoor unit

7

3-way valve

15.88mm(5/8")

2-way valve

9.52mm(3/8")

HSU-22LE04

3-way valve

2-way valve

6.35mm(1/4")

12.7mm(1/2")

HSU-18LE04

HSU-12LE04

HSU-09LE04

3-way valve

2-way valve

6.35mm(1/4")

9.52mm(3/8")

5.Purging Method:

Note: When extending piping, air inside piping shall be removed  by using external refrigerant gas, 

charge according to the following list.

Brand new outdoor unit is charged 50g or 80g(22k,24k) more refrigerant than regulated weight. Only for 

first installation, this extra 50g or 80g(22k,24k) can be used to purge airin pipes.

          During this procedure, 50g or 80g(22k,24k) refrigerant will be discharged in piping.(This must be

          strictly controlled within 90

o

 and 10 sec.)

When connecting pipe exceeds 5 meters, 20g or 60g

(only for 22k

 

24k) refrigerant shall be added per exceeding

 meter. Charge according to the following list. 

Piping length

Additional amount

5m

7m

No need

40g

10m

100g

for  7k 9k 12k 18k

Push the air out of the indoor unit

and piping as followes:
(1) Remove the valve cap on 2-way valve in outdoor unit.

(2) Loosen by 1/2 turn the flare nut of gas pipe, which is

is conneted to 3-way valve.

(3) Loosen 2-way valve by 90

o

 using hexagon wrench, 

and after approx.10 sec tighten it up. Gas comes out

     through flare nut on wide pipe. If no gas is discharged,

tighten flare nut with specified torque.

(4) Open 2-way and 3-way valves using specified torque.

(5) Tighten the caps on the valves with specified torque.

Valve rod

Valve cap

7-9

20-25

Tighten torque N.m

for  22k 24k 

for  7K 9K 12K: B=5m

for 18K 22K 24K: B=10m

Piping length

Additional amount

5m

7m

No need

120g

10m

300g

20m

900g

Max. Length:       for 7K 9K

: A=7m

                            for 12K           : A=10m

m

0

2

=

A

:

K22K 24K

8

1

r

o

f

Max.Elevation:

C

Outdoor unit

Indoor unit

Outdoor unit

Indoor unit

Oil trap

A

B

Outdoor unit

Indoor unit

A

B

A

B

CAUTION

In case more than 5 metres

oil trap

should be installed every 5~7m.

C

FJT-24L

FJT-18L

15.88mm(5/8")

FJT-12L

HSU-07LD03

12.7mm(1/2")

Summary of Contents for HSU-09LE04

Page 1: ...Drain hose Heating insulating material Piping hole cover Arrangement of piping directions Rear left Rear right Left Below Right The marks from to in the figure are the parts numbers The distance betw...

Page 2: ...rom televisions radios wireless apparatuses and fluorescent lamps can be left In the case of fixing the remote controller on a wall place where the indoor unit can receive signals when the fluorescent...

Page 3: ...ticle When the mounting plate is first fixed for the position of wall hole Fix to side bar and lintel a mounting bar Which is separately sold and then fasten the plate to the fixed mounting bar Make a...

Page 4: ...aslant from the underside and then put it down perpendicularly Remove terminal cover at right bottom corner of indoor unit then take off wiring cover by removing its screws When connecting the cable a...

Page 5: ...e sure the cables have been properly inserted and tightened After the cable connection never fail to fasten the connected cable with the wiring cover Note When connecting the cable confirm the termina...

Page 6: ...operation can not be carried out and controller may be damaged If the drain elbow is used please attach it as figure Note Only for heat pump unit Drawing for the installation of indoor and outdoor un...

Page 7: ...onal amount 5m 7m No need 40g 10m 100g for 7k 9k 12k 18k Push the air out of the indoor unit and piping as followes 1 Remove the valve cap on 2 way valve in outdoor unit 2 Loosen by 1 2 turn the flare...

Page 8: ...nfirm that drainage is carried out surely to outdoor In case that the attached drain hose is in a room please apply heat insulation to it without fail Please kindly explain to our customers how to ope...

Reviews: