8
Haier solar station
Installation introduction
Screw off the priming vent cap of priming valve, close the bigger check valve in the middle
of priming valve ( when two blades on the valve handle is vertical to axle of valve, it is
closed) and open another two smaller check valves.
Connect the output of priming equipment with one priming inlet and ensure the flowing
direction is the same with installation direction of check valve. Then Connect another
priming output with returning inlet of priming equipment. Start the priming equipment for
priming.
Observe the returned antifreeze until uniform returned flow and no bubble is realized. At
first close the check valve connected to returning inlet of priming equipment, then the
check valve connected to outlet of priming equipment, and open the bigger check valve in
the middle of priming valve. Disassemble the priming equipment.
1
2
3
Priming antifreeze
Notice
After priming, put 3/4 fibre gasket in the priming inlet cap and tighten it to prevent the
leakage of antifreeze.
CSH09J0455.indd 8
11/6/2009 4:08:20 PM