Checking and maintenance
Checking of the Safety valve
●
professional .
supply .
and extend the life of the equipment.
Checking of the hydraulic circuit
●
Cleaning of the fan
●
Checking of the evaporator
every six months
to check if it is running
correctly. Otherwise check for blocking and replace the safety valve if necessary.
Checking of the condensates discharge pipe
Checking of the Magnesium rod
water in the heat pump plastic base.
time.
24
Drain the water tank to empty
●
via the sewage outlet. Please stay away from the sewage outlet if there is hot water inside
the water tank to avoid injury.
Summary of Contents for HP80M5
Page 27: ......
Page 28: ...0040510083 20210218 V ...