507961-01G / 31-5000653
Page 55 of 57
Issue 2128
18. Mark and disconnect any remaining wiring to heating
compartment components. Disengage strain relief
bushing and pull wiring and bushing through the hole
in the blower deck.
19. Remove the primary limit from the vestibule panel.
20. Remove top cap screws to allow top cap to be
tilted upward to allow clearance for removing heat
exchanger.
21.
Remove two screws from the front cabinet flange at
the blower deck. Spread cabinet sides slightly to allow
clearance for removal of heat exchanger.
22. Remove screws along vestibule sides and bottom
which secure vestibule panel and heat exchanger
assembly to cabinet. Remove two screws from blower
rails which secure bottom heat exchanger flange.
Remove heat exchanger from furnace cabinet.
23. Back wash heat exchanger with soapy water solution
or steam. If steam is used it must be below 275°F
(135°C).
24. Thoroughly rinse and drain the heat exchanger. Soap
solutions can be corrosive. Take care to rinse entire
assembly.
25. Reinstall heat exchanger into cabinet making sure
that the rear baffle of the heat exchanger assembly
is nested under the support located at the rear of the
cabinet. Remove the indoor blower to view this area
through the blower opening.
26. Re–secure the supporting screws along the vestibule
sides.
27. Reinstall blower assembly and reinstall two screws
through rails.
28.
Reinstall cabinet screws on front flange at blower
deck.
29. Reinstall screws securing top cap.
30. Reinstall the primary limit on the vestibule panel.
31. Route heating component wiring through hole in
blower deck and reinsert strain relief bushing.
32. Reinstall pressure switch and reconnect pressure
switch wiring.
33. Carefully connect combustion air pressure switch
hosing from pressure switch to proper stubs on cold
end header collector box.
34.
Reinstall 1/2” NPT (if removed) in the cold end header
box. Reconnect drain tubing to collector box.
35. Reinstall condensate trap pipe. Reconnect condensate
drain line to the condensate trap.
36. Reinstall electrical junction box.
37.
Reinstall the combustion air inducer and flexible no
hub connector. Reconnect the 2 pin plug to the wire
harness.
38.
Reconnect drain tubes between flue collar and cold
end header box.
39. Secure burner assembly to vestibule panel using four
existing screws. Burners are self aligning to center of
clam shells.
40. Reconnect gas supply line to gas valve.
41.
Reconnect flame rollout switch wires.
42. Reconnect sensor wire and reconnect 2 pin plug from
ignitor.
43. Reconnect wires to gas valve.
44. Replace the blower compartment access panel.
45. Refer to instruction on verifying gas and electrical
connections when reestablishing supplies.
46. Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
47. Replace heating compartment access panel.
Cleaning the Burner Assembly
1.
Turn off gas and electrical power to the furnace.
Remove heating compartment access panel.
2. Disconnect the gas supply line from the gas valve.
3. Disconnect and label wires from gas valve.
4. Disconnect ignitor wiring at 2 circuit plug.
5. Disconnect and label wires from rollout switch.
6.
Disconnect and label flame sensor wire.
7.
Disconnect and label ground wire from burner/manifold
assembly.
8.
Remove four screws that secures burner/manifold
assembly to vestibule. Remove the assembly and
make note not to allow ignitor plate to dislodge from
the assembly.
9. Gently clean the face of the burners using the soft
brush attachment on a vacuum cleaner. Visually
inspect the inside of the burners and crossovers for
any blockage caused by foreign matter. Remove any
blockage
10.
Reinstall the burner/manifold assembly using the
existing four screws. Burners are self aligning to
center of clam shells.
11. Reconnect ground wire.
12.
Reconnect flame sensor wire.
13. Reconnect rollout switch wires.
14. Reconnect ignitor wires.
15. Reconnect gas valve wires.
16. Reconnect gas supply line to gas valve.
17. Refer to instructions on verifying gas and electrical
connections when re-establishing supplies.
18. Follow instructions to place furnace in operation. Run
furnace 5 minutes to ensure burners are clean and
operating correctly.
19. Replace heating compartment access panel.