Open
No gas leakage?
5.
Detach the charge hose
6.
from the service port, open 2-way valve and 3-way. Turn
the valve rod anticlockwiseuntil hitting lightly.
In case of gas leakage, tighten parts of pipe connection. If
leakage stops, then proceed 6. steps
If it does not stop gas leakage, discharge whole refrigerants from the service
port. After aring work again and vacuumize, ll up prescribed
refrigerant from the gas cylinder.
Anti countercurrent joint
Gaugemanifold(for R32)
2-way valve Liquid Side
3-way valve Gas Side
Vacuum pump(for R32)
Tube(for R32)
Close
2-way valve
3-way valve
Open 90
O
2-way valve
3-way valve
2-way valve 3-way valve
2-way valve
3-way valve
Valve rod cap
Valve rod cap
Service port cap
To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way
valve and 3-way’s a little more than the point where the torque increases suddenly.
After attaching the each caps, check the gas leakage around the caps.
7.
8.
Step 1.
Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
The power source must be exclusively used for air conditioner. (Over I0A)
In the case of installing an air conditioner in a moist place, please install an ea-
For installation in other places, use a circuit breaker as far as possible.
Pipe cutting is carried out with a pipe cutter and burs must be removed.
After inserting the are nut, aring work is carried out.
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuumize rst, then charge the liquid refrigerant into air conditio-
ner according to the amount marked on the name plate.
Please do not let other cooling medium, except speci ed one (R32), or air
enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system to make it crack and lead to personal injuries.
Power Source Installation
Cutting and Flaring Work of Piping
Flare tooling die
1.Cut pipe
2.Remove burs
3.Insert the are nut
CAUTION
Flare tool for R32
Conventional
are tool
Clutch-type
clutch-type(Rigid-type) Wing-nut type (Imperial-type)
A
0~0.5mm
1.0~1.5mm
1.5~2.0mm
rth leakage breaker.
4.Flare pipe
Lean Damage of are Crack
Partial Too outside
t
c
e
r
r
o
c
n
I
t
c
e
r
r
o
C
On Drainage
It becomes
high midway.
The gap with the
ground is too smal
There is the bad
smell from a ditch
It waves.
The end is imm-
ersed in water.
Please install the drain hose so as to be downward slope without fail.
Please don’t do the drainage as shown below.
Please pour water in the drain pan of the indoor unit, and
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please apply heat insulation to
Less than
5cm
con rm that drainage
it without fail.
4
Check Items for Test Run
Put check mark
in boxes
Gas leak from pipe connecting?
Heat insulation of pipe connecting?
Are the connecting wirings of indoor and outdoor rmly
Is the connecting wiring of indoor and outdoor rmly xed?
Is drainage securely carried out?
Is the earth line securely connected?
Is the indoor unit securely xed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
Please kindly explain to our customers how to operate
through the instruction manual.
Check for Installation and Test Run
inserted to the terminal block?
Refrigerant charge label
1
1+2=
kg
R32
2
kg
2=
1=
B
C
D
F
E
kg
A
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R32
GWP* value:675
GWP=global warming potential
Please fill in with indelible ink,
and
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Step 5.
Summary of Contents for 1U26JACFRA
Page 13: ...Pinping diagrams Domestic air conditioner 4 Pinping diagrams Filter Filter 11 ...
Page 14: ... Operation range Domestic air conditioner 5ˊOperation range 12 ...
Page 34: ...Dimensional drawings 8 Dimensional drawings 9 Center of gravity 3 2 Domestic air conditioner ...
Page 45: ...Seivice diagnosis Domestic air conditioner 43 ...
Page 46: ...Seivice diagnosis Domestic air conditioner 44 ...
Page 47: ...Seivice diagnosis Domestic air conditioner 45 ...
Page 67: ...Circuit diagrams Domestic air conditioner 12 2 Module board Circuit Diagram 57 ...
Page 69: ...Wall Mounted Type DC Inverter FREE MATCH NEW40 Series SERIES NEW40 ...