In case the vacuum state cannot be reached, vacuumizing shall be carried out from numerous positions, to

pump the refrigerant in each part of the system out;
(6)

It shall be guaranteed that the capacity of cylinders is sufficient before recovery;

(7)

The recovery equipment shall be started and operated as per the operation instructions of the manufacturer;

(8)

The  cylinder  cannot  be  charged  too  full.  (The  refrigerant  charged  cannot  exceed  80%  of  the  capacity  of

cylinders)
(9)

The maximum operating pressure of cylinders cannot be surpassed, not even for a short term;

(10) After refrigerant charging is completed, the cylinder and equipment must be evacuated rapidly, and all the
stop valves on the equipment must be closed;
(11) Before purification and tests, the refrigerant recovered cannot be charged into another refrigeration system.

Note:
The air conditioner shall be marked (with dates and signature) after being scrapped and the refrigerant is
discharged. It shall be guaranteed that the sign on the air conditioner can reflect the flammable refrigerant
charged inside.

Recovery

During  maintenance  or  scrapping,  the  refrigerant  inside  the  refrigeration  system  needs  to  be  cleared.  It  is 

recommended that the refrigerant be cleared thoroughly. 

The  refrigerant  can  only  be  charged  into  a  dedicated  cylinder,  the  capacity  of  which  shall  match  with  the 

refrigerant  amount  charged  in  the  whole  refrigeration  system.  All  cylinders  to  be  used  are  designated  for  the 
recovered refrigerant and labeled for that refrigerant (Dedicated Cylinder for Refrigerant Recovery). The cylinders 
shall be equipped with pressure relief valves and stop valves under favorable state. The empty cylinder shall be 
vacuumized before usage and be kept under normal temperature if possible.  

The  recovery  equipment  shall  always  be  under  favorable  working  state,  and  be  equipped  with  operation 

instructions,  to  facilitate  information  search.  The  recovery  equipment  shall  be  applicable  to  the  recovery  of 
flammable refrigerant. Moreover, weighing apparatus under available state with measurement certificates shall be 
equipped. In addition, removable attachment joints free from leakage shall be used as the hose, and shall always 
be under favorable state. Whether the recovery equipment is under favorable state and is properly maintained and 
whether all the electrical components are sealed shall be checked before usage, to avoid fire in case of refrigerant 
leakage. If you have any question, please contact your local dealer or qualified personnel. 

 

 

  

The  refrigerant  recovered  shall  be  delivered  back  to  the  manufacturer  in  appropriate  cylinders,  with 

transporting instructions being attached. Mixing of refrigerant in recovery equipment (especially the cylinders) is 
not allowed.  

During  transporting,  the  space  in  which  the  flammable  refrigerant  air  conditioners  are  loaded  cannot  be 

sealed.  Anti-static  measures  shall  be  taken  for  the  transporting  vehicles  if  necessary.  Meanwhile,  during  the 
transporting,  loading  and  unloading  of  air  conditioners,  necessary  protective  measures  shall  be  taken,  to  protect 
the air conditioner from being damaged.  

During  removal  of  the  compressor  or  clearing  of  the  compressor  oil,  it  shall  be  guaranteed  that  the 

compressor  is  vacuumized  to  a  proper  level,  to  ensure  no  residual  flammable  refrigerant  is  left  inside  the 
lubricating oil. The vacuumizing shall be completed before the compressor is delivered back to the manufacturer. 
The  vacuumizing  can  only  be  accelerated  by  heating  the  compressor  housing  through  electrical  heating.  Safety 
shall be guaranteed when the oil is discharged from the system.  

Scrapping

Before scrapping, the technician shall be completely familiar with the equipment and all its features. The safe 

recovery  of  refrigerant  is  recommended.  In  case  the  refrigerant  recovered  needs  to  be  reused,  before  which  the 
sample of refrigerant and oil shall be analyzed. The power supply required shall be guaranteed before tests.  

(1)

The equipment and operation shall be well known;

(2)

Power supply shall be switched off;

(3)

The followings shall be guaranteed before scrapping:

The mechanical equipment shall be convenient for operation on the cylinder of refrigerant (if necessary);

All personal protective equipment is available and being used correctly;

The whole course of recovery shall be guided by qualified personnel;

The recovery equipment and cylinders shall be in line with corresponding standards.

(4)

The refrigeration system shall be vacuumized if possible;

Scrapping and Recovery

12

Summary of Contents for 1U22KAEFRA

Page 1: ...24WADFRA 1U71WADFRA Please read this manual carefully before installation This appliance is filled with R32 Keep this operation manual for future reference 0011518288 1U09MAEFRA 1U12MAEFRA 1U18WAEFRA...

Page 2: ...nts 2 Installation Instructions 3 Relocation Procedures 8 Maintenance Instructions 9 Scrapping and Recovery 13 Indoor Outdoor Unit Installion Drawings 12 Safety Precautions 14 Read Before Installation...

Page 3: ...conditioner be sure to bleed the refrigerant circuit to ensure it is free of air and use only the specified refrigerant R32 Make sure ground connection is correct and reliable Do not earth the unit to...

Page 4: ...and open fire are not allowed around the air conditioner Transporting Management Requirements 1 The maximum transporting volume of finished products shall be determined as per local regulations 2 The...

Page 5: ...Air Conditioner Adding Extra Gas With Longer Pipe Calculator WARNING The area of the room in which R32 refrigerant air conditioner is installed cannot be less than the minimum area specified in the t...

Page 6: ...e checked first after unpacking In case the sign is raised the nitrogen sealed still exists Afterwards the black plastic seal cap at the joint of evaporator liquid pipes of the indoor unit shall be pr...

Page 7: ...Read operator manual Read technical manual Operator manual operating instructions Cotton clothes Anti static gloves BEWARE ELECTROSTATICS Goggles Electrical Safety Requirements Note 1 The surrounding...

Page 8: ...eak detection at the joint welding junction of the indoor unit and at the joint of connecting pipelines of the two way stop valve and three way stop valve of the outdoor unit It must be guaranteed tha...

Page 9: ...mount charged are recorded The refrigerant amount charged cannot be confirmed Test Run Installation Instructions 7 Please consult your reseller and or installer to determine if you have a DRED applian...

Page 10: ...r re flaring the same to the outdoor unit Relocation Procedures 8 contractor supplied line a b c d a Fix the OREO module on the board through the bayonet b Reinforce OREO module with screw c Connect c...

Page 11: ...re qualified for safety disposal of refrigerant as required in the assessment regulations 2 The equipment can only be maintained and repaired as per the method recommended by the manufacturer In case...

Page 12: ...maintenance it shall be guaranteed that the sealing functions will not be damaged or the sealing materials will not lose the function of preventing the entry of flammable gas due to aging The substit...

Page 13: ...ntamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possible to reduce the residual of refrigerant inside The cyli...

Page 14: ...shall be used as the hose and shall always be under favorable state Whether the recovery equipment is under favorable state and is properly maintained and whether all the electrical components are se...

Page 15: ...ndoor unit AIR OUTLET AIR INLET CONNECTING PIPING AND ELECTRICAL WIRING DRAIN HOSE 4 Compressor Inside of Unit 1 When installing the unit to wall roof or rooftop fix a supporter surely with nails or w...

Page 16: ...explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 14 Safety Precautions R32 R R3 32 2 R32 R32 R32 R32 for conventional HFC refrigerants w...

Page 17: ...R32 15 Safety Precautions WARNING CAUTION N Open the window and well ventilated the room...

Page 18: ...roof breaker for current leakage at the power source to avoid the risk of the electric shock Without a breaker for current leakage will cause risks of electric shock fire or explosion Do not use large...

Page 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 17...

Page 20: ...3 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 18...

Page 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A Read Before Installation 19...

Page 22: ...EFRA 1U18WAEFRA 1U50WAEFRA 1U24WAEFRA 1U71WAEFRA B 60mm B 60mm A 212mm C 126mm 51mm 51mm B 60mm B 60mm AS60QEEHRA A 218mm C 151mm 38 5mm 38 5mm AS50QDEHRA Installation Procedure 655 155 130 404 Floor...

Page 23: ...If the pipe has to be lengthened the refrigerant should be charged according to Dg m But the charge of refrigerant must be conducted by professional air conditioner engineer Before adding additional...

Page 24: ...Installation Procedure 22...

Page 25: ...evacuation degree Evacuate Installation Procedure 23...

Page 26: ...cal 4G1 0mm 4G1 0mm 3G1 5mm 3G2 5mm 1U71WADFRA Power cable 3G1 5mm2 4G1 0mm 2 POWER 1U26MADFRA 1U35MADFRA 1U53WADFRA 1U71WADFRA 4G1 0mm 7 1KW 4G1 0mm 3G2 5mm 30 2 5 25 25 20 1 POWER 1U25MAEFRA 1U35MAE...

Page 27: ...stantaneous stop F27 Directly display 8 Compressor discarging temperature protection F4 Directly display F8 Trouble record 9 Abnormal of DC motor F21 Directly display 10 Abnormal of piping sensor F7 D...

Page 28: ...our policy of continuous product improvement these dimensionsandspeci cationsmaychangeatanytime Youshouldthereforecheckwithyourdealeror Haier s Customer Care Centre to ensure this yer correctly descri...

Reviews: