Inspection on Maintenance Environment 

Before operation, the refrigerant leaked in the room is not allowed.

The area of the room in which maintenance is made shall be in line with the nameplate.

Continuous ventilation shall be maintained during maintenance.

Open fire or high-temperature heat source higher than 548 degree which can easily give birth to open fire is

not allowed inside the room within the maintenance area.

During maintenance, the phones and the radioactive electronics of all the operators inside the room must be

powered off.

One  dry  powder  or  carbon  dioxide  extinguisher  shall  be  equipped  inside  the  maintenance  area,  and  the

extinguisher must be working

.

 

Maintenance Site Requirements 

Maintenance Precautions 

Precautions 

For all the faults requiring welding the refrigeration pipelines or components inside the refrigeration system

of R32 refrigerant air conditioners, maintenance at the user’s site is never allowed.

For  the  faults  requiring  radical  disassembly  and  bending  operation  of  the  heat  exchanger,  such  as  the

replacement of the outdoor unit chassis and integral disassembly of the condenser, inspection and maintenance at
the user’s site are never allowed.

For  the  faults  requiring  replacement  of  the  compressor  or  parts  &  components  of  refrigeration  system,

maintenance at the user’s site is not allowed.

For  other  faults  not  involved  in  the  refrigerant  container,  internal  refrigeration  pipelines  and  refrigeration

elements, the  maintenance  at  the  user’s  site  is  allowed,  including  the  cleaning  and  dredging  of  the  refrigeration
system requiring no disassembly of refrigeration elements and no welding.

In  case  replacement  of  gas/liquid  pipes  is  required  during  maintenance,  the  joint  of  evaporator  gas/liquid

pipes of the indoor unit shall be cut off with a cutting knife. Connection is only allowed after re-flaring (the same
to the outdoor unit).

Qualification Requirements of Maintenance Personnel 

1.

All the operators or the maintenance personnel involved in refrigerating circuits shall be provided with the

effective certificate issued by an industry-accepted assessment institute, to ensure that they are qualified for safety
disposal of refrigerant as required in the assessment regulations.
2.

The equipment can only be maintained and  repaired as per the method recommended by the manufacturer.

In  case  the  assistance  from  personnel  of  other  disciplines  is  required,  the  assistance  shall  be  supervised  by  the
personnel with qualification certificate involved in flammable refrigerant.

Maintenance Instructions

The  maintenance  site  shall  be  provided  with favorable  ventilation  and  must  be  flat.  Arrangement  of  the

maintenance site inside the basement is not allowed.

Welding zone and non-welding zone shall be divided at the maintenance site, and shall be clearly marked. A

certain safety distance must be guaranteed between the two zones.

Ventilators shall be installed  at  the maintenance  site, and  exhaust fans,  fans, ceiling  fans,  floor fans and

dedicated exhaust duct can be arranged, to meet the requirements of ventilation volume and uniform exhaust, and
to avoid accumulation of refrigerant gas.

Leak detection equipment  for flammable  refrigerant shall be equipped,  with relevant  management  system

being  established.  Whether  the  leak  detection equipment  is under  available  state  shall  be  confirmed  before
maintenance.

Sufficient dedicated vacuum  pumps  of flammable  refrigerant  and  refrigerant  charging  equipment  shall be

equipped, with relevant management system for maintenance equipment being established. It shall be guaranteed
that  the  maintenance  equipment  can  only  be  used  for  vacuumizing  and  charging  of  one  type  of  flammable
refrigerant, and mixed usage is not allowed.

 

The master power switch shall be installed outside the maintenance site, with protective (anti-explosive)

 

device

equipped.

Nitrogen cylinders, acetylene  cylinders and oxygen cylinders  shall be placed separately.  The distance

between the gas cylinders above and the working area involved in open fire shall be at least 6m. The anti-backfire
valve shall be installed for the acetylene cylinders. The color  of the acetylene cylinders  and oxygen cylinders
installed shall meet the international requirements.

The warning sign of “No Fire” shall be arranged inside the maintenance area.

Fire control device suitable  for electric appliance such as the dry powder extinguisher  or  carbon dioxide

extinguisher shall be equipped, and shall always be under the available state.

9

Summary of Contents for 1U22KAEFRA

Page 1: ...24WADFRA 1U71WADFRA Please read this manual carefully before installation This appliance is filled with R32 Keep this operation manual for future reference 0011518288 1U09MAEFRA 1U12MAEFRA 1U18WAEFRA...

Page 2: ...nts 2 Installation Instructions 3 Relocation Procedures 8 Maintenance Instructions 9 Scrapping and Recovery 13 Indoor Outdoor Unit Installion Drawings 12 Safety Precautions 14 Read Before Installation...

Page 3: ...conditioner be sure to bleed the refrigerant circuit to ensure it is free of air and use only the specified refrigerant R32 Make sure ground connection is correct and reliable Do not earth the unit to...

Page 4: ...and open fire are not allowed around the air conditioner Transporting Management Requirements 1 The maximum transporting volume of finished products shall be determined as per local regulations 2 The...

Page 5: ...Air Conditioner Adding Extra Gas With Longer Pipe Calculator WARNING The area of the room in which R32 refrigerant air conditioner is installed cannot be less than the minimum area specified in the t...

Page 6: ...e checked first after unpacking In case the sign is raised the nitrogen sealed still exists Afterwards the black plastic seal cap at the joint of evaporator liquid pipes of the indoor unit shall be pr...

Page 7: ...Read operator manual Read technical manual Operator manual operating instructions Cotton clothes Anti static gloves BEWARE ELECTROSTATICS Goggles Electrical Safety Requirements Note 1 The surrounding...

Page 8: ...eak detection at the joint welding junction of the indoor unit and at the joint of connecting pipelines of the two way stop valve and three way stop valve of the outdoor unit It must be guaranteed tha...

Page 9: ...mount charged are recorded The refrigerant amount charged cannot be confirmed Test Run Installation Instructions 7 Please consult your reseller and or installer to determine if you have a DRED applian...

Page 10: ...r re flaring the same to the outdoor unit Relocation Procedures 8 contractor supplied line a b c d a Fix the OREO module on the board through the bayonet b Reinforce OREO module with screw c Connect c...

Page 11: ...re qualified for safety disposal of refrigerant as required in the assessment regulations 2 The equipment can only be maintained and repaired as per the method recommended by the manufacturer In case...

Page 12: ...maintenance it shall be guaranteed that the sealing functions will not be damaged or the sealing materials will not lose the function of preventing the entry of flammable gas due to aging The substit...

Page 13: ...ntamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possible to reduce the residual of refrigerant inside The cyli...

Page 14: ...shall be used as the hose and shall always be under favorable state Whether the recovery equipment is under favorable state and is properly maintained and whether all the electrical components are se...

Page 15: ...ndoor unit AIR OUTLET AIR INLET CONNECTING PIPING AND ELECTRICAL WIRING DRAIN HOSE 4 Compressor Inside of Unit 1 When installing the unit to wall roof or rooftop fix a supporter surely with nails or w...

Page 16: ...explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 14 Safety Precautions R32 R R3 32 2 R32 R32 R32 R32 for conventional HFC refrigerants w...

Page 17: ...R32 15 Safety Precautions WARNING CAUTION N Open the window and well ventilated the room...

Page 18: ...roof breaker for current leakage at the power source to avoid the risk of the electric shock Without a breaker for current leakage will cause risks of electric shock fire or explosion Do not use large...

Page 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 17...

Page 20: ...3 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 18...

Page 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A Read Before Installation 19...

Page 22: ...EFRA 1U18WAEFRA 1U50WAEFRA 1U24WAEFRA 1U71WAEFRA B 60mm B 60mm A 212mm C 126mm 51mm 51mm B 60mm B 60mm AS60QEEHRA A 218mm C 151mm 38 5mm 38 5mm AS50QDEHRA Installation Procedure 655 155 130 404 Floor...

Page 23: ...If the pipe has to be lengthened the refrigerant should be charged according to Dg m But the charge of refrigerant must be conducted by professional air conditioner engineer Before adding additional...

Page 24: ...Installation Procedure 22...

Page 25: ...evacuation degree Evacuate Installation Procedure 23...

Page 26: ...cal 4G1 0mm 4G1 0mm 3G1 5mm 3G2 5mm 1U71WADFRA Power cable 3G1 5mm2 4G1 0mm 2 POWER 1U26MADFRA 1U35MADFRA 1U53WADFRA 1U71WADFRA 4G1 0mm 7 1KW 4G1 0mm 3G2 5mm 30 2 5 25 25 20 1 POWER 1U25MAEFRA 1U35MAE...

Page 27: ...stantaneous stop F27 Directly display 8 Compressor discarging temperature protection F4 Directly display F8 Trouble record 9 Abnormal of DC motor F21 Directly display 10 Abnormal of piping sensor F7 D...

Page 28: ...our policy of continuous product improvement these dimensionsandspeci cationsmaychangeatanytime Youshouldthereforecheckwithyourdealeror Haier s Customer Care Centre to ensure this yer correctly descri...

Reviews: