![Hagie SmarTrax 2100 Series Installation Manual Download Page 7](http://html1.mh-extra.com/html/hagie/smartrax-2100-series/smartrax-2100-series_installation-manual_3201653007.webp)
5
INSTALLING PRESSURE LINE
Original pressure line is removed from orbital, routed back to hydraulic manifold, and attached to “P”
port on hydraulic block.
Original Pressure
Hose
E x c e s s
Flow Hose
Attach excess flow hose to “EF” port on top of
Raven valve using supplied 90
o
#8 JIC fitting.
Attach tank hose to “T” port.
Attach left steer hose to “A” port.
Attach right steer hose to “B” port.
Tank
Left
Right
Summary of Contents for SmarTrax 2100 Series
Page 10: ......